Determination of OCS Mast Offset in Johore Bahru Sentral for GemasJohor Electrified Double Track Project

The Gemas – Johor Bahru Electrified Double Track Project (GJBEDTP) is the most recent railway electrification. GJBEDTP runs from Gemas Railway Station to Johore Bahru (JB) Sentral. Since the JB Sentral station platform track is existing, it cannot achieve the minimal offset in the client's Sta...

Full description

Saved in:
Bibliographic Details
Main Authors: Kamis, Muhamad Syakir, Abd Latif, Muhamad Faiz, Ramli, Mimi Faisyalini, Ganasan, Reventheran, Shamsuddin, Mohd Asran, Mahyeddin, Mohd Eizzuddin, Iskandar, Nadia Amena
Format: Article
Language:en
Published: semarak ilmu 2024
Subjects:
Online Access:http://eprints.uthm.edu.my/12367/1/J17828_3ac820c95068a6b9fb530ff7af029aaf.pdf
http://eprints.uthm.edu.my/12367/
https://doi.org/10.37934/araset.44.2.184198
Tags: Add Tag
No Tags, Be the first to tag this record!