Preliminary Groundwater Assessment using Electrical Method at Quaternary Deposits Area

Alternative water sources using groundwater has increasingly demand in recent years. In the past, proper and systematic study of groundwater potential was varies due to several constraints. Conventionally, tube well point was drilled based on subjective judgment of several parties which may lead to...

Full description

Saved in:
Bibliographic Details
Main Authors: Hazreek, Z.A.M, Raqib, A.G.A., Aziman, M., Azhar, A.T.S., Khaidir, A.T.M., Fairus, Y.M., Rosli, S., Mohd Fakhrurrazi, Ishak, Izzaty, R.A.
Format: Conference or Workshop Item
Language:en
Published: IOP Publishing Ltd 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/20631/1/Premilinary%20Groundwater%20Assessment.pdf
http://umpir.ump.edu.my/id/eprint/20631/
http://iopscience.iop.org/article/10.1088/1757-899X/226/1/012042/pdf
Tags: Add Tag
No Tags, Be the first to tag this record!