Beam Search Approach for the Multiobjective Flow-shop Scheduling Problem
In this paper, we address the problem of minimizing maximum completion time and average flow-time simultaneously in a flow-shop environment. We formulate the problem as a bi-criteria flow-shop scheduling problem in which it minimizes the maximum completion time and average flow-time. We develop and...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Conference or Workshop Item |
| Published: |
2000
|
| Subjects: | |
| Online Access: | https://library.oum.edu.my/repository/622/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
