Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects

Current studies shows that most of the Industrialized Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach.This traditional construction process has been widely criticized for its fragmented approach to project delivery and its failure...

全面介绍

Saved in:
书目详细资料
Main Authors: Mohd Nawi, Mohd Nasrun, Haron, Ahmad Tarmizi, Abd Hamid, Zuhairi, Mohamad Kamar, Kamarul Anuar, Baharuddin, Yusnizam
格式: Article
语言:English
出版: Construction Research Institute of Malaysia 2014
主题:
在线阅读:http://repo.uum.edu.my/18854/1/MCRJ%2015%20%202%20%202014%201-15.pdf
http://repo.uum.edu.my/18854/
http://www.cream.my/publication/download-mcrj.html
标签: 添加标签
没有标签, 成为第一个标记此记录!