Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects

Current studies shows that most of the Industrialized Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach.This traditional construction process has been widely criticized for its fragmented approach to project delivery and its failure...

全面介紹

Saved in:
書目詳細資料
Main Authors: Mohd Nawi, Mohd Nasrun, Haron, Ahmad Tarmizi, Abd Hamid, Zuhairi, Mohamad Kamar, Kamarul Anuar, Baharuddin, Yusnizam
格式: Article
語言:English
出版: Construction Research Institute of Malaysia 2014
主題:
在線閱讀:http://repo.uum.edu.my/18854/1/MCRJ%2015%20%202%20%202014%201-15.pdf
http://repo.uum.edu.my/18854/
http://www.cream.my/publication/download-mcrj.html
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!