Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects

Current studies shows that most of the Industrialized Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach.This traditional construction process has been widely criticized for its fragmented approach to project delivery and its failure...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلفون الرئيسيون: Mohd Nawi, Mohd Nasrun, Haron, Ahmad Tarmizi, Abd Hamid, Zuhairi, Mohamad Kamar, Kamarul Anuar, Baharuddin, Yusnizam
التنسيق: مقال
اللغة:English
منشور في: Construction Research Institute of Malaysia 2014
الموضوعات:
الوصول للمادة أونلاين:http://repo.uum.edu.my/18854/1/MCRJ%2015%20%202%20%202014%201-15.pdf
http://repo.uum.edu.my/18854/
http://www.cream.my/publication/download-mcrj.html
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!