Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
Current studies shows that most of the Industrialized Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach.This traditional construction process has been widely criticized for its fragmented approach to project delivery and its failure...
保存先:
主要な著者: | , , , , |
---|---|
フォーマット: | 論文 |
言語: | English |
出版事項: |
Construction Research Institute of Malaysia
2014
|
主題: | |
オンライン・アクセス: | http://repo.uum.edu.my/18854/1/MCRJ%2015%20%202%20%202014%201-15.pdf http://repo.uum.edu.my/18854/ http://www.cream.my/publication/download-mcrj.html |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
id |
my.uum.repo.18854 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.188542016-10-11T03:48:02Z http://repo.uum.edu.my/18854/ Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects Mohd Nawi, Mohd Nasrun Haron, Ahmad Tarmizi Abd Hamid, Zuhairi Mohamad Kamar, Kamarul Anuar Baharuddin, Yusnizam TH Building construction Current studies shows that most of the Industrialized Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach.This traditional construction process has been widely criticized for its fragmented approach to project delivery and its failure to form effective teams. Due to that problem, a number of issues have recently arisen in current construction methods, such as reworks, time delay, rising costs, lack of communication and coordination, and wastage.This paper through literature review aims to explore this fragmentation issue thus effects to the Malaysian IBS construction projects especially during the design and construction stages. Suggestion on how an integrated approach such as Building Information Modelling (BIM) and Integrated Project Delivery (IPD) can contribute for design and construction process in order to minimise the fragmentation issue will be concluded. Construction Research Institute of Malaysia 2014 Article PeerReviewed application/pdf en http://repo.uum.edu.my/18854/1/MCRJ%2015%20%202%20%202014%201-15.pdf Mohd Nawi, Mohd Nasrun and Haron, Ahmad Tarmizi and Abd Hamid, Zuhairi and Mohamad Kamar, Kamarul Anuar and Baharuddin, Yusnizam (2014) Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects. Malaysian Construction Research Journal, 15 (2). pp. 1-15. ISSN 1985-3807 http://www.cream.my/publication/download-mcrj.html |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Mohd Nawi, Mohd Nasrun Haron, Ahmad Tarmizi Abd Hamid, Zuhairi Mohamad Kamar, Kamarul Anuar Baharuddin, Yusnizam Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects |
description |
Current studies shows that most of the Industrialized Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach.This traditional construction process has been widely criticized for its fragmented approach to project delivery and its failure to form effective teams. Due to that problem, a number of issues have recently arisen in current construction methods, such as reworks, time delay, rising costs, lack of communication and coordination, and wastage.This paper through literature review aims to explore this fragmentation issue thus effects to the Malaysian IBS construction projects especially during the design and construction stages. Suggestion on how an integrated approach such as Building Information Modelling (BIM) and Integrated Project Delivery (IPD) can contribute for design and construction process in order to minimise the fragmentation issue will be concluded. |
format |
Article |
author |
Mohd Nawi, Mohd Nasrun Haron, Ahmad Tarmizi Abd Hamid, Zuhairi Mohamad Kamar, Kamarul Anuar Baharuddin, Yusnizam |
author_facet |
Mohd Nawi, Mohd Nasrun Haron, Ahmad Tarmizi Abd Hamid, Zuhairi Mohamad Kamar, Kamarul Anuar Baharuddin, Yusnizam |
author_sort |
Mohd Nawi, Mohd Nasrun |
title |
Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects |
title_short |
Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects |
title_full |
Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects |
title_fullStr |
Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects |
title_full_unstemmed |
Improving integrated practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects |
title_sort |
improving integrated practice through building information modeling-integrated project delivery (bim-ipd) for malaysian industrialised building system (ibs) construction projects |
publisher |
Construction Research Institute of Malaysia |
publishDate |
2014 |
url |
http://repo.uum.edu.my/18854/1/MCRJ%2015%20%202%20%202014%201-15.pdf http://repo.uum.edu.my/18854/ http://www.cream.my/publication/download-mcrj.html |
_version_ |
1644282551108370432 |
score |
13.149126 |