Payment issues in Malaysia Industrialised Building System (IBS): A research framework

The existence of Industrialised Building System (IBS) has gained much attention from Malaysia government. The utilization of IBS would lead to reducing project cost and time, enhancing productivity and quality of project outcomes, reducing on workers and increasing environmental and construction sit...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلفون الرئيسيون: Mohd Nawi, Mohd Nasrun, Mydin, Md Azree Othuman, Nursal, Ahmad Taufik, Abdul Nifa, Faizatul Akmar, Hanafi, Mohd Hanizun
التنسيق: مقال
اللغة:English
منشور في: AENSI Journals 2015
الموضوعات:
الوصول للمادة أونلاين:http://repo.uum.edu.my/13878/1/Pay.pdf
http://repo.uum.edu.my/13878/
http://www.aensiweb.com/AEB/
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
id my.uum.repo.13878
record_format eprints
spelling my.uum.repo.138782016-04-17T00:58:25Z http://repo.uum.edu.my/13878/ Payment issues in Malaysia Industrialised Building System (IBS): A research framework Mohd Nawi, Mohd Nasrun Mydin, Md Azree Othuman Nursal, Ahmad Taufik Abdul Nifa, Faizatul Akmar Hanafi, Mohd Hanizun TH Building construction The existence of Industrialised Building System (IBS) has gained much attention from Malaysia government. The utilization of IBS would lead to reducing project cost and time, enhancing productivity and quality of project outcomes, reducing on workers and increasing environmental and construction site cleanness. Since 2003, numerous of effort has been undertaken to promote IBS adoption among the construction players. However, till date the level of IBS adoption among the construction players in Malaysia is still low and far from the government expectation.It is evident that one of the main barriers to IBS adoption in Malaysia is the current procurement and payment mechanisms.This due to the domination of traditional method that's widely been practiced in the development of the IBS project, which is not parallel with the initial concept of IBS. Thus, this study attempt to address this issue and suggest an improvement for procurement and payment process in the current IBS practice in Malaysia. AENSI Journals 2015-03 Article PeerReviewed application/pdf en cc4_by http://repo.uum.edu.my/13878/1/Pay.pdf Mohd Nawi, Mohd Nasrun and Mydin, Md Azree Othuman and Nursal, Ahmad Taufik and Abdul Nifa, Faizatul Akmar and Hanafi, Mohd Hanizun (2015) Payment issues in Malaysia Industrialised Building System (IBS): A research framework. Advances in Environmental Biology, 9 (4). pp. 88-91. ISSN 1995 - 0756 http://www.aensiweb.com/AEB/
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Mohd Nawi, Mohd Nasrun
Mydin, Md Azree Othuman
Nursal, Ahmad Taufik
Abdul Nifa, Faizatul Akmar
Hanafi, Mohd Hanizun
Payment issues in Malaysia Industrialised Building System (IBS): A research framework
description The existence of Industrialised Building System (IBS) has gained much attention from Malaysia government. The utilization of IBS would lead to reducing project cost and time, enhancing productivity and quality of project outcomes, reducing on workers and increasing environmental and construction site cleanness. Since 2003, numerous of effort has been undertaken to promote IBS adoption among the construction players. However, till date the level of IBS adoption among the construction players in Malaysia is still low and far from the government expectation.It is evident that one of the main barriers to IBS adoption in Malaysia is the current procurement and payment mechanisms.This due to the domination of traditional method that's widely been practiced in the development of the IBS project, which is not parallel with the initial concept of IBS. Thus, this study attempt to address this issue and suggest an improvement for procurement and payment process in the current IBS practice in Malaysia.
format Article
author Mohd Nawi, Mohd Nasrun
Mydin, Md Azree Othuman
Nursal, Ahmad Taufik
Abdul Nifa, Faizatul Akmar
Hanafi, Mohd Hanizun
author_facet Mohd Nawi, Mohd Nasrun
Mydin, Md Azree Othuman
Nursal, Ahmad Taufik
Abdul Nifa, Faizatul Akmar
Hanafi, Mohd Hanizun
author_sort Mohd Nawi, Mohd Nasrun
title Payment issues in Malaysia Industrialised Building System (IBS): A research framework
title_short Payment issues in Malaysia Industrialised Building System (IBS): A research framework
title_full Payment issues in Malaysia Industrialised Building System (IBS): A research framework
title_fullStr Payment issues in Malaysia Industrialised Building System (IBS): A research framework
title_full_unstemmed Payment issues in Malaysia Industrialised Building System (IBS): A research framework
title_sort payment issues in malaysia industrialised building system (ibs): a research framework
publisher AENSI Journals
publishDate 2015
url http://repo.uum.edu.my/13878/1/Pay.pdf
http://repo.uum.edu.my/13878/
http://www.aensiweb.com/AEB/
_version_ 1644281306979237888
score 13.149126