Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage,...
Saved in:
Main Authors: | , , |
---|---|
格式: | Conference or Workshop Item |
語言: | English |
出版: |
2013
|
主題: | |
在線閱讀: | http://repo.uum.edu.my/11747/1/Naw.pdf http://repo.uum.edu.my/11747/ |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|