Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects

Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage,...

詳細記述

保存先:
書誌詳細
主要な著者: Mohd Nawi, Mohd Nasrun, Baluch, Nazim Hussain, Omar, Mohd Faizal
フォーマット: Conference or Workshop Item
言語:English
出版事項: 2013
主題:
オンライン・アクセス:http://repo.uum.edu.my/11747/1/Naw.pdf
http://repo.uum.edu.my/11747/
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!