Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects

Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage,...

全面介绍

Saved in:
书目详细资料
Main Authors: Mohd Nawi, Mohd Nasrun, Baluch, Nazim Hussain, Omar, Mohd Faizal
格式: Conference or Workshop Item
语言:English
出版: 2013
主题:
在线阅读:http://repo.uum.edu.my/11747/1/Naw.pdf
http://repo.uum.edu.my/11747/
标签: 添加标签
没有标签, 成为第一个标记此记录!

相似书籍