Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage,...
Saved in:
Main Authors: | Mohd Nawi, Mohd Nasrun, Baluch, Nazim Hussain, Omar, Mohd Faizal |
---|---|
格式: | Conference or Workshop Item |
語言: | English |
出版: |
2013
|
主題: | |
在線閱讀: | http://repo.uum.edu.my/11747/1/Naw.pdf http://repo.uum.edu.my/11747/ |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2012) -
Supply Chain Management (SCM): Disintegration Team Factors in Malaysian Industrialised Building System (IBS) Construction Projects
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2018) -
A critical literature review on the concept of team integration in Industrialised Building System (IBS) project
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2011) -
The experiences of Malaysian in industrialised building system (IBS) to enhance construct ability and sustainability in construction project
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2011) -
An ability of WhatsApp usage in Industrialised Building System (IBS) construction project
由: Ahmad Pozin, Mohd Affendi, et al.
出版: (2019)