Vendor managed inventory adoption in Malaysia construction industry

The growth of the Malaysian construction industry is burdened by conditions in which 'time overruns' in projects still exist. The quest to overcome construction delays motivates the industry to improve its performance by learning from the other industries. Supply chain management is an imp...

全面介绍

Saved in:
书目详细资料
主要作者: Pamungkas, Andrew Triasmoro
格式: Thesis
语言:English
English
English
出版: 2019
主题:
在线阅读:https://etd.uum.edu.my/9952/1/permission%20to%20deposit-grant%20the%20permission-821818.pdf
https://etd.uum.edu.my/9952/2/s821818_01.pdf
https://etd.uum.edu.my/9952/3/s821818_references.docx
https://etd.uum.edu.my/9952/
标签: 添加标签
没有标签, 成为第一个标记此记录!