Vendor managed inventory adoption in Malaysia construction industry
The growth of the Malaysian construction industry is burdened by conditions in which 'time overruns' in projects still exist. The quest to overcome construction delays motivates the industry to improve its performance by learning from the other industries. Supply chain management is an imp...
Saved in:
主要作者: | |
---|---|
格式: | Thesis |
語言: | English English English |
出版: |
2019
|
主題: | |
在線閱讀: | https://etd.uum.edu.my/9952/1/permission%20to%20deposit-grant%20the%20permission-821818.pdf https://etd.uum.edu.my/9952/2/s821818_01.pdf https://etd.uum.edu.my/9952/3/s821818_references.docx https://etd.uum.edu.my/9952/ |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|