Barriers of communication in managing Industrialised Building System (IBS) projects in the northern region of Malaysia: Virtual team communication practices

Communication issue is one of the challenges faced by the current Malaysian construction projects particularly those with the Industrialized Building System (IBS). During the implementation of IBS project, fragmentation process that takes place in project execution has led to major problems in commu...

全面介绍

Saved in:
书目详细资料
主要作者: Mohd Affendi, Ahmad Pozin
格式: Thesis
语言:English
English
English
English
出版: 2018
主题:
在线阅读:https://etd.uum.edu.my/10134/1/kebenaran%20mendeposit-tidak%20membenarkan-817571.pdf
https://etd.uum.edu.my/10134/9/s817571_01.pdf
https://etd.uum.edu.my/10134/8/s817571_02.pdf
https://etd.uum.edu.my/10134/4/s817571_references.docx
https://etd.uum.edu.my/10134/
标签: 添加标签
没有标签, 成为第一个标记此记录!