Probable Maximum Precipitation comparison using hershfield's statistical method and hydro-meteorological method for Sungai Perak Hydroelectric Scheme
One of the potential risks attributed to the occurrence of dam overtopping and dam wall failure due to the inadequacy of the spillway capacities is the loss of life and property damages in the downstream area. The current practices in most countries in minimizing these risks are by analyzing the ext...
保存先:
主要な著者: | Razali J., Sidek L.M., Rashid M.A., Hussein A., Marufuzzaman M. |
---|---|
その他の著者: | 42862303000 |
フォーマット: | 論文 |
出版事項: |
Science Publishing Corporation Inc
2023
|
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Validation of hershfield probable maximum precipitation estimation using homogeneous region in Malaysia.
著者:: Paramasivam, R., 等
出版事項: (2023) -
PMP Driven Probable Maximum Flood for 4 Dams in Sungai Perak Hydroelectric Scheme
著者:: Razali J., 等
出版事項: (2023) -
Probable Maximum Precipitation Estimation Using Statistical Approach
著者:: Ismail, Nurul Jannah
出版事項: (2017) -
Estimation of probable maximum precipitation for tropical catchment
著者:: Sammen S., 等
出版事項: (2023) -
Estimation of Probable Maximum Precipitation Using Deterministic Regional Approach for Sungai Perak TNB Dams
著者:: Isparan K., 等
出版事項: (2023)