AHP-based analysis of the risk assessment delay case study of public road construction project: An empirical study

This study proposes an empirical study of risk assessment module for public road construction projects. A case study of a conventional road construction project for new road access for a university that is located in East Coast Malaysia is adopted in this study. Seven delay factors and twenty-two su...

詳細記述

保存先:
書誌詳細
主要な著者: Putri Zulaiha, Razi, Mohamad Idris, Ali, Noram Irwan, Ramli
フォーマット: 論文
言語:English
出版事項: Taylor's University 2019
主題:
オンライン・アクセス:http://umpir.ump.edu.my/id/eprint/26502/1/AHP-Based%20Analysis%20of%20the%20Risk%20Assessment%20Delay.pdf
http://umpir.ump.edu.my/id/eprint/26502/
http://jestec.taylors.edu.my/V14Issue2.htm
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!