Project management

Outcome based Education: 1. Students are able to select a product with maximum components are 15. 2. Students are able to distinguish between project and project management based on their product. 3. Students are able to describe the potential of their project failure based on time, cost, scope a...

全面介紹

Saved in:
書目詳細資料
主要作者: Mohd Yazid, Abu
格式: 圖書
語言:English
English
出版: Penerbit Universiti Malaysia Pahang 2018
主題:
在線閱讀:http://umpir.ump.edu.my/id/eprint/22077/1/Cover_Module%20Project%20Management.jpg
http://umpir.ump.edu.my/id/eprint/22077/2/Teks_Module%20Project%20Management.pdf
http://umpir.ump.edu.my/id/eprint/22077/
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!