Project management
Outcome based Education: 1. Students are able to select a product with maximum components are 15. 2. Students are able to distinguish between project and project management based on their product. 3. Students are able to describe the potential of their project failure based on time, cost, scope a...
Saved in:
主要作者: | |
---|---|
格式: | 图书 |
语言: | English English |
出版: |
Penerbit Universiti Malaysia Pahang
2018
|
主题: | |
在线阅读: | http://umpir.ump.edu.my/id/eprint/22077/1/Cover_Module%20Project%20Management.jpg http://umpir.ump.edu.my/id/eprint/22077/2/Teks_Module%20Project%20Management.pdf http://umpir.ump.edu.my/id/eprint/22077/ |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
id |
my.ump.umpir.22077 |
---|---|
record_format |
eprints |
spelling |
my.ump.umpir.220772018-12-04T02:23:30Z http://umpir.ump.edu.my/id/eprint/22077/ Project management Mohd Yazid, Abu HD28 Management. Industrial Management Outcome based Education: 1. Students are able to select a product with maximum components are 15. 2. Students are able to distinguish between project and project management based on their product. 3. Students are able to describe the potential of their project failure based on time, cost, scope and quality management. 4. Students are able to choose their product classification with justification. 5. Students are able to explain the impact of 6 factors towards their product. Penerbit Universiti Malaysia Pahang 2018 Book PeerReviewed image en http://umpir.ump.edu.my/id/eprint/22077/1/Cover_Module%20Project%20Management.jpg pdf en http://umpir.ump.edu.my/id/eprint/22077/2/Teks_Module%20Project%20Management.pdf Mohd Yazid, Abu (2018) Project management. Penerbit Universiti Malaysia Pahang, Kuantan, Pahang. ISBN 978-967-2054-89-4 |
institution |
Universiti Malaysia Pahang |
building |
UMP Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Pahang |
content_source |
UMP Institutional Repository |
url_provider |
http://umpir.ump.edu.my/ |
language |
English English |
topic |
HD28 Management. Industrial Management |
spellingShingle |
HD28 Management. Industrial Management Mohd Yazid, Abu Project management |
description |
Outcome based Education:
1. Students are able to select a product with maximum components are 15.
2. Students are able to distinguish between project and project management based on their product.
3. Students are able to describe the potential of their project failure based on time, cost, scope and quality management.
4. Students are able to choose their product classification with justification.
5. Students are able to explain the impact of 6 factors towards their
product. |
format |
Book |
author |
Mohd Yazid, Abu |
author_facet |
Mohd Yazid, Abu |
author_sort |
Mohd Yazid, Abu |
title |
Project management |
title_short |
Project management |
title_full |
Project management |
title_fullStr |
Project management |
title_full_unstemmed |
Project management |
title_sort |
project management |
publisher |
Penerbit Universiti Malaysia Pahang |
publishDate |
2018 |
url |
http://umpir.ump.edu.my/id/eprint/22077/1/Cover_Module%20Project%20Management.jpg http://umpir.ump.edu.my/id/eprint/22077/2/Teks_Module%20Project%20Management.pdf http://umpir.ump.edu.my/id/eprint/22077/ |
_version_ |
1643669286655361024 |
score |
13.149126 |