Search Results - (( waste collection data algorithm ) OR ( java application optimization algorithm ))

Refine Results
  1. 1
  2. 2

    Performance evaluation of real-time multiprocessor scheduling algorithms by Alhussian, H., Zakaria, N., Abdulkadir, S.J., Fageeri, S.O.

    Published 2016
    “…These results suggests that optimal algorithms may turn to be non-optimal when practically implemented, unlike USG which reveals far less scheduling overhead and hence could be practically implemented in real-world applications. …”
    Get full text
    Get full text
    Conference or Workshop Item
  3. 3

    Optimising a waste management system using the Artificial Bee Colony (ABC) algorithm by Mohamad Fadzil, Nur Hamisha Helanie

    Published 2025
    “…The study adopted data from Qiao et al. (2020). The data contain a single depot, 47 waste collection points and 11 vehicles with maximum capacity of 80 tonnes. …”
    Get full text
    Get full text
    Student Project
  4. 4

    Route Optimization System by Zulkifli, Abdul Hayy

    Published 2005
    “…After much research into the many algorithms available, and considering some, including Genetic Algorithm (GA), the author selected Dijkstra's Algorithm (DA). …”
    Get full text
    Get full text
    Final Year Project
  5. 5
  6. 6

    A case study of minimising travel time for waste management problem with limited picking capacity in Taman Seremban 3 / Nur Yasmin Izzatul Zaid, Norezwannim Ibrahim and Nur Umairah... by Zaid, Nur Yasmin Izzatul, Ibrahim, Norezwannim, Zainol Hamizi, Nur Umairah

    Published 2024
    “…Finally, the study will determine the minimum travel time for a garbage truck to collect waste in Taman Seremban 3. Using the Dijkstra's algorithm in Python, the minimum travel time for the garbage truck to collect waste in Taman Seremban 3 was 2.55 hours. …”
    Get full text
    Get full text
    Student Project
  7. 7
  8. 8
  9. 9

    Smart Routing For Solid Waste Collection by Ngiam, John Tze

    Published 2023
    “…The system will provide waste collection companies and garbage truck drivers with a user�friendly platform for optimizing routes. …”
    Get full text
    Get full text
    Get full text
    Final Year Project Report / IMRAD
  10. 10
  11. 11

    Ant Colony Optimization for Solving Solid Waste Collection Scheduling Problems by Ismail, Zuhaimy, Loh, Ser Lee

    Published 2009
    “…Problem statement: Southern Waste Management environment (SWM environment) is a company responsible for the collection and disposal of solid waste for the city of Johor Bahru, a city with over one million populations. …”
    Get full text
    Get full text
    Get full text
    Article
  12. 12

    Ant colony optimization for solving solid waste collection scheduling problems by Ismail, Zuhaimy, Loh, S. L.

    Published 2009
    “…Southern Waste Management environment (SWM environment) is a company responsible for the collection and disposal of solid waste for the city of Johor Bahru, a city with over one million populations. …”
    Get full text
    Get full text
    Get full text
    Article
  13. 13
  14. 14

    Computer Lab Timetabling Using Genetic Algorithm Case Study - Unit ICT by Abdullah, Amran

    Published 2006
    “…Genetic Algorithm is one of the most popular optimization solutions used in various applications such as scheduling. …”
    Get full text
    Get full text
    Thesis
  15. 15
  16. 16

    Smart waste management system with IoT monitoring by Kalitazan, Sachein, Muniswaran, Suvarshan, Velan, Sheshan, Muniswaran, Suvathithan, Shah, Dhanesh

    Published 2023
    “…Through advanced data analytics and machine learning algorithms, the platform predicts waste accumulation patterns, optimizes collection routes, schedules pickups based on fill-level data, and detects any abnormal conditions. …”
    Get full text
    Get full text
    Get full text
    Article
  17. 17

    IoT-Enabled Waste Tracking and Recycling Optimization : Enhancing Sustainable Waste Management by Eugine Teh, Yin Jie, Chee Soon, Chong, Rozaimi, Ghazali, Hazriq Izzuan, Jaafar, Muhamad Fadli, Ghani, Howe Cheng, Teng, Nur Farhanah, Zulkipli, Siaw Hong, Liew

    Published 2025
    “…Advanced data preprocessing, such as augmentation and normalization, ensures robust model training, while optimized algorithms guide waste sorting based on classification results. …”
    Get full text
    Get full text
    Get full text
    Proceeding
  18. 18

    Examination timetabling using genetic algorithm case study: KUiTTHO by Mohd Salikon, Mohd Zaki

    Published 2005
    “…Genetic Algorithm (GA) is one of the most popular optimization solutions. …”
    Get full text
    Get full text
    Thesis
  19. 19

    Design of smart waste bin and prediction algorithm for waste management in household area by Yusoff, Siti Hajar, Abdullah Din, Ummi Nur Kamilah, Mansor, Hasmah, Midi, Nur Shahida, Zaini, Syasya Azra

    Published 2018
    “…The limitation to this study is that the amount of smart waste bin should be replicated more so that all data for waste weight is directly collected from the smart waste bin.…”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  20. 20

    Nearest greedy for solving the waste collection vehicle routing problem: A case study by Mat, Nur Azriati, Benjamin, Aida Mauziah, Abdul-Rahman, Syariza, Wibowo, Antoni

    Published 2017
    “…This paper presents a real case study pertaining to an issue related to waste collection in the northern part of Malaysia by using a constructive heuristic algorithm known as the Nearest Greedy (NG) technique. …”
    Get full text
    Get full text
    Article