Search Results - (( variable planning model algorithm ) OR ( java application using algorithm ))

Refine Results
  1. 1

    Automated time series forecasting by Ismail, Suzilah, Zakaria, Rohaiza, Tuan Muda, Tuan Zalizam

    Published 2011
    “…While quantitative technique is based on statistical concepts and requires large amount of data in order to formulate the mathematical models.This technique can be classified into projective and causal technique.The projective technique (or univariate modelling) just involve one variable while the causal technique (or econometric modelling) suitable for multi-variables.Since forecasting involves uncertainty, several methods need to be executed on one set of time series data in order to produce accurate forecast.Hence, usually in practice forecaster need to use several softwares to obtain the forecast values.If this practice can be transformed into algorithm (well-defined rules for solving a problem) and then the algorithm can be transformed into a computer program, less time will be needed to compute the forecast values where in business world time is money.In this study, we focused on algorithm development for univariate forecasting techniques only and will expand towards econometric modelling in the future.Two set of simulated data (yearly and non-yearly) and several univariate forecasting techniques (i.e. …”
    Get full text
    Get full text
    Get full text
    Monograph
  2. 2

    RSA Encryption & Decryption using JAVA by Ramli, Marliyana

    Published 2006
    “…References and theories to support the research of 'RSA Encryption/Decryption using Java' have been disclosed in Literature Review section. …”
    Get full text
    Get full text
    Final Year Project
  3. 3
  4. 4
  5. 5

    Optimization of Upstream Offshore Oilfield Production Planning under Uncertainty and Downstream Crude Oil Scheduling at Refinery Front-End by Tan , Yin Keong

    Published 2009
    “…The solution obtained from the LB-MILP model, i.e., the decision variables (binary variables), was used to obtain a feasible solution for model UB-NLP. …”
    Get full text
    Get full text
    Final Year Project
  6. 6

    Optimization of Upstream Offshore Oilfield Production Planning under Uncertainty and Downstream Crude Oil Scheduling at Refinery Front-End by Tan Yin Keong, Tan Yin

    Published 2012
    “…The solution obtained from the LB–MILP model, i.e., the decision variables (binary variables), was used to obtain a feasible solution for model UB–NLP. …”
    Get full text
    Get full text
    Final Year Project
  7. 7

    Optimal timber transportation planning in tropical hill forest using bees algorithm by Jamaluddin, Jamhuri

    Published 2022
    “…Combining these two techniques allows TTP to be linked to timber harvesting area models. The planning depends on the legal restrictions, fixed and variable costs, landing locations, as well as the existing and proposed road network. …”
    Get full text
    Get full text
    Thesis
  8. 8

    Dynamic Bayesian Networks and Variable Length Genetic Algorithm for Dialogue Act Recognition by Ali Yahya, Anwar

    Published 2007
    “…In the selection phase, a new variable length genetic algorithm is applied to select the lexical cues. …”
    Get full text
    Get full text
    Thesis
  9. 9

    Process Planning Optimization In Reconfigurable Manufacturing Systems by Musharavati, Farayi

    Published 2008
    “…(i) what decision making models and (ii) what computational techniques, provide an optimal manufacturing process planning solution in a multidimensional decision variables space? …”
    Get full text
    Get full text
    Thesis
  10. 10

    A bacteria foraging algorithm for solving integrated multi-period cell formation and subcontracting production planning in a dynamic cellular manufacturing system by Tang, Sai Hong, Nouri, Hossein, Motlagh, Omid Reza Esmaeili

    Published 2011
    “…This research aims to apply this emerging optimisation algorithm to develop a mixed-integer programming model for designing cellular manufacturing systems (CMSs), and production planning in dynamic environments. …”
    Get full text
    Get full text
    Get full text
    Article
  11. 11

    Real-Time Video Processing Using Native Programming on Android Platform by Saipullah, Khairul Muzzammil

    Published 2012
    “…However for the Android platform that based on the JAVA language, most of the software algorithm is running on JAVA that consumes more time to be compiled. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  12. 12
  13. 13
  14. 14
  15. 15

    Optimal planning of photovoltaic distributed generation considering uncertainties using monte carlo pdf embedded MVMO-SH by Norhafidzah, Mohd Saad

    Published 2021
    “…The load flow patterns will significantly have affected when uncertain PV generation – load models are considered into the power flow algorithm. …”
    Get full text
    Get full text
    Thesis
  16. 16

    Real-time algorithmic music composition application. by Yap, Alisa Yi Hui

    Published 2022
    “…This project is about the study of evolutionary music, and focuses on the development of an algorithmic music composer using the Java programming language. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  17. 17

    Performance evaluation of real-time multiprocessor scheduling algorithms by Alhussian, H., Zakaria, N., Abdulkadir, S.J., Fageeri, S.O.

    Published 2016
    “…We hyave used the CPU profiler of Oracle JavaTM VisualVM to monitor the execution of LRE-TL as well as USG algorithms. …”
    Get full text
    Get full text
    Conference or Workshop Item
  18. 18
  19. 19

    Application of genetic algorithm and JFugue in an evolutionary music generator by Tang, Jia Rou

    Published 2025
    “…This project explores the application of Genetic Algorithms (GA) with JFugue, which is a Java-based music programming library to develop an Evolutionary Music Generator. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  20. 20

    Capacity Planning For Mixed-Load Tester Under Demand And Testing Time Uncertainty by Asih, Hayati Mukti

    Published 2018
    “…Currently,the company’s issue is low tester utilization of about 71%,well below the target of 96%.The objective of this research is to improve tester utilization while achieving the production target under uncertain demand and testing time and also to determine the break-even point on the testers required.A novel approach of integrating a mathematical model,robust optimization model,genetic algorithm,simulation model and cost–volume –profit analysis was developed.Firstly,a mathematical model of mixed-load tester was formulated.Next,a set of discrete scenarios was proposed to address uncertain demand and testing time.A robust optimization and genetic algorithm model was developed to optimize the number of testers under the described uncertainties.Next,these scenarios were simulated using the Pro Model simulation software to validate the proposed models and to evaluate throughput and tester utilization.Finally,the cost–volume–profit analysis was performed for scenarios that require additional testers at various levels of uncertainties.The results showed that the proposed solution improved tester utilization by 25% compared to the current system.This research has contribution by developing novel hybrid methodology and able to provide useful insights to assist company’s managers to plan and allocate resources according to variations in customers’ demands and testing time.…”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis