Search Results - (( solution construction based algorithm ) OR ( program implementation during algorithm ))
Search alternatives:
- program implementation »
- solution construction »
- implementation during »
- construction based »
- during algorithm »
-
1
A multi-depot vehicle routing problem with stochastic road capacity and reduced two-stage stochastic integer linear programming models for rollout algorithm
Published 2021“…The proposed approach is suitable for obtaining a policy constructed dynamically on the go during the rollout algorithm. …”
Get full text
Get full text
Article -
2
Design and statistical analysis of initial solution construction approach in curriculum based course timetabling problem
Published 2017“…This paper investigates the construction phase approach in which the sequential order of the courses/lectures applied several combination of graph heuristics to generate a population of initial solutions in curriculum-based course timetabling (CBCTT).The construction of population of initial solution is a prerequisite in a population-based metaheuristic implementation. …”
Get full text
Get full text
Conference or Workshop Item -
3
Analytical model for partially prestressed concrete beam-column elements
Published 2017“…The developed analytical model and plasticity theory were codified and implemented in a special finite element program named ARCS3D in order to perform inelastic static and dynamic analysis for PPC structures. …”
Get full text
Get full text
Get full text
Thesis -
4
Utilizing the roulette wheel based social network search algorithm for substitution box construction and optimization
Published 2023“…This paper introduces a new variant of a recent metaheuristic algorithm based on the Social Network Search algorithm (SNS), which is called the Roulette Wheel Social Network Search algorithm (SNS). …”
Get full text
Get full text
Get full text
Get full text
Article -
5
Pairwise testing tools based on hill climbing algorithm (PTCA)
Published 2014“…The actual implementation of the algorithm which is in Java programming language, the program is implemented on Net Bean 7.0.1. …”
Get full text
Get full text
Undergraduates Project Papers -
6
Development of dynamic programming algorithm for maintenance scheduling problem
Published 2020“…Then, the data of the maintenance team from one of the utilities provider company in Malaysia was collected to be implemented in the development of a dynamic programming algorithm. …”
Get full text
Get full text
Thesis -
7
A hybrid adaptive harmony search with modified great deluge algorithm for school timetabling
Published 2025“…In Phase 1, heuristic rules refine the time assignment stage to improve an existing construction algorithm. Phase 2 adaptively tunes parameters based on iteration position, solution number, behavioral status, and parameter linkages. …”
Get full text
Get full text
Thesis -
8
Enhanced Intelligent Water Drops Algorithm for University Examination Timetabling Problems
Published 2024“…(iii) It is a constructive-based meta-heuristic algorithm which means, the solution is incrementally constructed (step by step) until the complete solution is obtained (Noferesti and Shah-Hosseini, 2012). …”
thesis::doctoral thesis -
9
A new meta heuristic evolutionary programming (NMEP) in optimizing economic energy dispatch
Published 2016“…The proposed optimization algorithm, namely New Meta-Heuristic Evolutionary Programming (NMEP) algorithm is followed to Meta-Heuristic Evolutionary Programming (Meta-EP) approach with some modification where the cloning process embedded as a significant progress during the implementation. …”
Get full text
Get full text
Get full text
Article -
10
Sequential constructive algorithm incorporate with fuzzy logic for solving real world course timetabling problem
Published 2020“…Sequential constructive algorithm is one of the popular methods for solving timetabling problems. …”
Get full text
Get full text
Get full text
Conference or Workshop Item -
11
Harmony annealing algorithm for curriculum-based course timetabling problem
Published 2012“…An attempt to solve these problems was made via an approach broken down into two parts; first, constructive algorithm with saturation degree approach was used to ensure a feasible solution, where the hard constraints are satisfied.Secondly, Harmony annealing algorithm was used to further improve the results obtained.The algorithm produced results that were not comparatively better than those previously known as best solution.With proper modification in terms of the approach in this algorithm would make the algorithm perform better on curriculum-based course timetabling.…”
Get full text
Get full text
Get full text
Conference or Workshop Item -
12
Construction of initial solution population for curriculum-based course timetabling using combination of graph heuristics
Published 2016“…The construction of population of initial solution is a crucial task in population-based metaheuristic approach for solving curriculum-based university course timetabling problem because it can affect the convergence speed and also the quality of the final solution.This paper presents an exploration on combination of graph heuristics in construction approach in curriculum based course timetabling problem to produce a population of initial solutions.The graph heuristics were set as single and combination of two heuristics.In addition, several ways of assigning courses into room and timeslot are implemented.All settings of heuristics are then tested on the same curriculum based course timetabling problem instances and are compared with each other in terms of number of population produced.The result shows that combination of largest degree followed by saturation degree heuristic produce the highest number of population of initial solutions.The results from this study can be used in the improvement phase of algorithm that uses population of initial solutions…”
Get full text
Get full text
Get full text
Article -
13
Enhancing the Sorting Layers in the Initial Stage of High School Timetabling
Published 2020“…KHE is an algorithm that generates initial solution of HSTP. …”
Get full text
Get full text
Get full text
Conference or Workshop Item -
14
-
15
Sequential Constructive Algorithm incorporate with Fuzzy Logic for Solving Real World Course Timetabling Problem
Published 2020“…Sequential constructive algorithm is one of the popular methods for solving timetabling problems. …”
Get full text
Get full text
Get full text
Get full text
Get full text
Book -
16
Integrated optimal control and parameter estimation algorithms for discrete-time nonlinear stochastic dynamical systems
Published 2011“…In this work, a simplified model-based optimal control model with adjustable parameters is constructed. …”
Get full text
Get full text
Thesis -
17
Constructing population of initial solutions for curriculum – based course timetabling problem
Published 2012“…Future work will use the best settings of heuristics to the improvement phase in population-based improvement algorithm.…”
Get full text
Get full text
Conference or Workshop Item -
18
Automated multi-agent negotiation framework for the construction domain
Published 2023Conference Paper -
19
An Efficient Computational Algorithm for Solving Arbitrary Sylvester Matrix Equations in Fuzzy Control Theory (S/O 14179)
Published 2021“…As a result, the constructed algorithm has successfully demonstrated the solutions for the arbitrary FFSME, with minimum complexity of the fuzzy operations. …”
Get full text
Get full text
Monograph -
20
CHAOS BASED BLOCK ENCRYPTOR
Published 2008“…In this project we will propose encryption algorithm which offer less computational complexity and also provide securing data not only during transmission but also during storage. …”
Get full text
Get full text
Final Year Project
