Search Results - (( solution construction based algorithm ) OR ( java application optimized algorithm ))

Refine Results
  1. 1

    Ant colony optimization algorithm for load balancing in grid computing by Ku-Mahamud, Ku Ruhana, Mohamed Din, Aniza

    Published 2012
    “…Global pheromone update is performed after the completion of processing the jobs in order to reduce the pheromone value of resources.A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against other ant based algorithm, in terms of resource utilization. …”
    Get full text
    Get full text
    Get full text
    Monograph
  2. 2

    Enhancement of Ant Colony Optimization for Grid Job Scheduling and Load Balancing by Husna, Jamal Abdul Nasir

    Published 2011
    “…Experimental results show that EACO produced better grid resource management solution compared to other algorithms. …”
    Get full text
    Get full text
    Get full text
    Thesis
  3. 3

    Resource management in grid computing using ant colony optimization by Ku-Mahamud, Ku Ruhana, Mohamed Din, Aniza

    Published 2011
    “…Resources with high pheromone value are selected to process the submitted jobs.Global pheromone update is performed after completion processing the jobs in order to reduce the pheromone value of resources.A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against other ant based algorithm, in terms of resource utilization.Experimental results show that EACO produced better grid resource management solution.…”
    Get full text
    Get full text
    Get full text
    Get full text
    Monograph
  4. 4
  5. 5

    Performance evaluation of real-time multiprocessor scheduling algorithms by Alhussian, H., Zakaria, N., Abdulkadir, S.J., Fageeri, S.O.

    Published 2016
    “…These results suggests that optimal algorithms may turn to be non-optimal when practically implemented, unlike USG which reveals far less scheduling overhead and hence could be practically implemented in real-world applications. …”
    Get full text
    Get full text
    Conference or Workshop Item
  6. 6

    Route Optimization System by Zulkifli, Abdul Hayy

    Published 2005
    “…After much research into the many algorithms available, and considering some, including Genetic Algorithm (GA), the author selected Dijkstra's Algorithm (DA). …”
    Get full text
    Get full text
    Final Year Project
  7. 7
  8. 8
  9. 9

    Design and statistical analysis of initial solution construction approach in curriculum based course timetabling problem by Wahid, Juliana, Mohd Hussin, Naimah

    Published 2017
    “…This paper investigates the construction phase approach in which the sequential order of the courses/lectures applied several combination of graph heuristics to generate a population of initial solutions in curriculum-based course timetabling (CBCTT).The construction of population of initial solution is a prerequisite in a population-based metaheuristic implementation. …”
    Get full text
    Get full text
    Conference or Workshop Item
  10. 10

    Utilizing the roulette wheel based social network search algorithm for substitution box construction and optimization by Kamal Z., Zamli, Alhadawi, Hussam S., Fakhrud Din, .

    Published 2023
    “…This paper introduces a new variant of a recent metaheuristic algorithm based on the Social Network Search algorithm (SNS), which is called the Roulette Wheel Social Network Search algorithm (SNS). …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  11. 11

    A hybrid adaptive harmony search with modified great deluge algorithm for school timetabling by Arbaoui, Billel

    Published 2025
    “…In Phase 1, heuristic rules refine the time assignment stage to improve an existing construction algorithm. Phase 2 adaptively tunes parameters based on iteration position, solution number, behavioral status, and parameter linkages. …”
    Get full text
    Get full text
    Thesis
  12. 12

    Enhanced Intelligent Water Drops Algorithm for University Examination Timetabling Problems by Bashar AbedAl Mohdi Talal AlDeeb

    Published 2024
    “…(iii) It is a constructive-based meta-heuristic algorithm which means, the solution is incrementally constructed (step by step) until the complete solution is obtained (Noferesti and Shah-Hosseini, 2012). …”
    thesis::doctoral thesis
  13. 13

    Computer Lab Timetabling Using Genetic Algorithm Case Study - Unit ICT by Abdullah, Amran

    Published 2006
    “…Genetic Algorithm is one of the most popular optimization solutions used in various applications such as scheduling. …”
    Get full text
    Get full text
    Thesis
  14. 14
  15. 15

    Sequential constructive algorithm incorporate with fuzzy logic for solving real world course timetabling problem by Tan, Li June, Joe H. Obit, Leau, Yu Beng, Jetol Bolongkikit, Rayner Alfred

    Published 2020
    “…Sequential constructive algorithm is one of the popular methods for solving timetabling problems. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  16. 16

    Harmony annealing algorithm for curriculum-based course timetabling problem by Wahid, Juliana, Mohd Hussin, Naimah

    Published 2012
    “…An attempt to solve these problems was made via an approach broken down into two parts; first, constructive algorithm with saturation degree approach was used to ensure a feasible solution, where the hard constraints are satisfied.Secondly, Harmony annealing algorithm was used to further improve the results obtained.The algorithm produced results that were not comparatively better than those previously known as best solution.With proper modification in terms of the approach in this algorithm would make the algorithm perform better on curriculum-based course timetabling.…”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  17. 17

    Construction of initial solution population for curriculum-based course timetabling using combination of graph heuristics by Wahid, Juliana, Mohd Hussin, Naimah

    Published 2016
    “…The construction of population of initial solution is a crucial task in population-based metaheuristic approach for solving curriculum-based university course timetabling problem because it can affect the convergence speed and also the quality of the final solution.This paper presents an exploration on combination of graph heuristics in construction approach in curriculum based course timetabling problem to produce a population of initial solutions.The graph heuristics were set as single and combination of two heuristics.In addition, several ways of assigning courses into room and timeslot are implemented.All settings of heuristics are then tested on the same curriculum based course timetabling problem instances and are compared with each other in terms of number of population produced.The result shows that combination of largest degree followed by saturation degree heuristic produce the highest number of population of initial solutions.The results from this study can be used in the improvement phase of algorithm that uses population of initial solutions…”
    Get full text
    Get full text
    Get full text
    Article
  18. 18

    Examination timetabling using genetic algorithm case study: KUiTTHO by Mohd Salikon, Mohd Zaki

    Published 2005
    “…Genetic Algorithm (GA) is one of the most popular optimization solutions. …”
    Get full text
    Get full text
    Thesis
  19. 19

    Enhancing the Sorting Layers in the Initial Stage of High School Timetabling by Arbaoui, Billel, Wahid, Juliana, Abdul-Rahman, Syariza

    Published 2020
    “…KHE is an algorithm that generates initial solution of HSTP. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  20. 20