Search Results - (( solution constructing based algorithm ) OR ( java implementation success algorithm ))

Refine Results
  1. 1

    Pairwise testing tools based on hill climbing algorithm (PTCA) by Lim, Seng Kee

    Published 2014
    “…The actual implementation of the algorithm which is in Java programming language, the program is implemented on Net Bean 7.0.1. …”
    Get full text
    Get full text
    Undergraduates Project Papers
  2. 2

    Audio Streaming System Using Real-Time Transport Protocol Based on Java Media Framework by Asaad Aref, Ibrahim

    Published 2004
    “…Java Media Framework library and the RTP protocol for audio transmission were used as development tools.The developed system designed in this thesis together with experimental results proved that the system could be implemented successfully. …”
    Get full text
    Get full text
    Thesis
  3. 3

    A Toolkit for Simulation of Desktop Grid Environment by FOROUSHAN, PAYAM CHINI

    Published 2014
    “…A simulator for desktop grid environment has been developed using Java as the implementation language due to its wide popularity. …”
    Get full text
    Get full text
    Final Year Project
  4. 4

    Efficient kerberos authentication scheme for cross-domain systems in industrial internet of things using ECC by Ismail, Haqi Khalid

    Published 2021
    “…In addition, a proof of concept is constructed to validate the proposed multi-factor Kerberos authentication using Java programming language. …”
    Get full text
    Get full text
    Thesis
  5. 5

    An approach for cross-site scripting detection and removal based on genetic algorithms. by Hydara, Isatou, Md Sultan, Abu Bakar, Zulzalil, Hazura, Admodisastro, Novia

    Published 2014
    “…The proposed approach is, so far, only implemented and validated on Java-based Web applications, although it can be implemented in other programming languages with slight modifications. …”
    Get full text
    Get full text
    Conference or Workshop Item
  6. 6

    Design and statistical analysis of initial solution construction approach in curriculum based course timetabling problem by Wahid, Juliana, Mohd Hussin, Naimah

    Published 2017
    “…This paper investigates the construction phase approach in which the sequential order of the courses/lectures applied several combination of graph heuristics to generate a population of initial solutions in curriculum-based course timetabling (CBCTT).The construction of population of initial solution is a prerequisite in a population-based metaheuristic implementation. …”
    Get full text
    Get full text
    Conference or Workshop Item
  7. 7
  8. 8

    Cross-site scripting detection based on an enhanced genetic algorithm by Hydara, Isatou, Md Sultan, Abu Bakar, Zulzalil, Hazura, Admodisastro, Novia Indriaty

    Published 2015
    “…The proposed approach is, so far, only implemented and validated on Java-based Web applications, although it can be implemented in other programming languages with slight modifications. …”
    Get full text
    Get full text
    Conference or Workshop Item
  9. 9

    Utilizing the roulette wheel based social network search algorithm for substitution box construction and optimization by Kamal Z., Zamli, Alhadawi, Hussam S., Fakhrud Din, .

    Published 2023
    “…This paper introduces a new variant of a recent metaheuristic algorithm based on the Social Network Search algorithm (SNS), which is called the Roulette Wheel Social Network Search algorithm (SNS). …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  10. 10

    A hybrid adaptive harmony search with modified great deluge algorithm for school timetabling by Arbaoui, Billel

    Published 2025
    “…In Phase 1, heuristic rules refine the time assignment stage to improve an existing construction algorithm. Phase 2 adaptively tunes parameters based on iteration position, solution number, behavioral status, and parameter linkages. …”
    Get full text
    Get full text
    Thesis
  11. 11

    Enhanced Intelligent Water Drops Algorithm for University Examination Timetabling Problems by Bashar AbedAl Mohdi Talal AlDeeb

    Published 2024
    “…(iii) It is a constructive-based meta-heuristic algorithm which means, the solution is incrementally constructed (step by step) until the complete solution is obtained (Noferesti and Shah-Hosseini, 2012). …”
    thesis::doctoral thesis
  12. 12

    Comparison of performances of Jaya Algorithm and Cuckoo Search algorithm using benchmark functions by Ahmed, Mashuk, Nasser, Abdullah B., Kamal Z., Zamli, Heripracoyo, Sulistyo

    Published 2022
    “…CS and JA have implemented in the same platform (Intellij IDEA Community Edition 2020.2.3) using the same language (Java). …”
    Get full text
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  13. 13

    Sequential constructive algorithm incorporate with fuzzy logic for solving real world course timetabling problem by Tan, Li June, Joe H. Obit, Leau, Yu Beng, Jetol Bolongkikit, Rayner Alfred

    Published 2020
    “…Sequential constructive algorithm is one of the popular methods for solving timetabling problems. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  14. 14

    Harmony annealing algorithm for curriculum-based course timetabling problem by Wahid, Juliana, Mohd Hussin, Naimah

    Published 2012
    “…An attempt to solve these problems was made via an approach broken down into two parts; first, constructive algorithm with saturation degree approach was used to ensure a feasible solution, where the hard constraints are satisfied.Secondly, Harmony annealing algorithm was used to further improve the results obtained.The algorithm produced results that were not comparatively better than those previously known as best solution.With proper modification in terms of the approach in this algorithm would make the algorithm perform better on curriculum-based course timetabling.…”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  15. 15

    Construction of initial solution population for curriculum-based course timetabling using combination of graph heuristics by Wahid, Juliana, Mohd Hussin, Naimah

    Published 2016
    “…The construction of population of initial solution is a crucial task in population-based metaheuristic approach for solving curriculum-based university course timetabling problem because it can affect the convergence speed and also the quality of the final solution.This paper presents an exploration on combination of graph heuristics in construction approach in curriculum based course timetabling problem to produce a population of initial solutions.The graph heuristics were set as single and combination of two heuristics.In addition, several ways of assigning courses into room and timeslot are implemented.All settings of heuristics are then tested on the same curriculum based course timetabling problem instances and are compared with each other in terms of number of population produced.The result shows that combination of largest degree followed by saturation degree heuristic produce the highest number of population of initial solutions.The results from this study can be used in the improvement phase of algorithm that uses population of initial solutions…”
    Get full text
    Get full text
    Get full text
    Article
  16. 16

    Enhancing the Sorting Layers in the Initial Stage of High School Timetabling by Arbaoui, Billel, Wahid, Juliana, Abdul-Rahman, Syariza

    Published 2020
    “…KHE is an algorithm that generates initial solution of HSTP. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  17. 17
  18. 18
  19. 19

    Integrated optimal control and parameter estimation algorithms for discrete-time nonlinear stochastic dynamical systems by Kek, Sie Long

    Published 2011
    “…In this work, a simplified model-based optimal control model with adjustable parameters is constructed. …”
    Get full text
    Get full text
    Thesis
  20. 20

    Constructing population of initial solutions for curriculum – based course timetabling problem by Wahid, Juliana, Mohd Hussin, Naimah

    Published 2012
    “…Future work will use the best settings of heuristics to the improvement phase in population-based improvement algorithm.…”
    Get full text
    Get full text
    Conference or Workshop Item