Search Results - (( programming planning application algorithm ) OR ( java data normalization algorithm ))

Refine Results
  1. 1

    Web-based clustering tool using fuzzy k-mean algorithm / Ahmad Zuladzlan Zulkifly by Zulkifly, Ahmad Zuladzlan

    Published 2019
    “…Even a normal people using clustering to grouping their data. …”
    Get full text
    Get full text
    Thesis
  2. 2

    SANAsms: Secure short messaging system for secure GSM mobile communication by Anuar, N.B., Azlan, I.M., Wahid, A.W.A., Zakaria, O.

    Published 2008
    “…The system is developed using Java 2 Micro Edition (J2ME) which is written in Java. …”
    Get full text
    Get full text
    Conference or Workshop Item
  3. 3
  4. 4

    Features selection for intrusion detection system using hybridize PSO-SVM by Tabaan, Alaa Abdulrahman

    Published 2016
    “…Electing the best set of features will help to improve the classifier predictions in terms of the normal and abnormal pattern. The simulation will be carried on WEKA tool, which allows us to call some data mining methods under JAVA environment. …”
    Get full text
    Get full text
    Thesis
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9

    Vision-based robot indoor navigation by Teo, Zhin Hang

    Published 2022
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17

    Challenges of hidden data in the unused area two within executable files by Naji, Ahmed Wathik, Zaidan, A.A., Zaidan, B.B.

    Published 2009
    “…The designed algorithms were intended to help in proposed system aim to hide and retract information (data file) with in unused area 2 of any execution file(exe.file). …”
    Get full text
    Get full text
    Get full text
    Article
  18. 18

    Development of a Production Planning and Control Software in Total Productivity Maintenance Environment by Lee, Pang Seng

    Published 2004
    “…A TPM based software program has been developed to ease the process of production planning and control in TPM environment by executing sequential methodology such as problem identification, literature review, problem formulation, data coliection, company operation review, flow chart system and program algorithm before test run in the company. …”
    Get full text
    Get full text
    Thesis
  19. 19
  20. 20