Search Results - (( program solving path algorithm ) OR ( java implementation plan algorithm ))

Refine Results
  1. 1

    Path planning algorithm for a car like robot based on MILP method by Mohd Sadri, Mohd Pawzi

    Published 2013
    “…This project is presents an algorithm for path planning optimal routes mobile robot “like a car” to a target in unknown environment. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6

    Solving a Reconfigurable Maze using Hybrid Wall Follower Algorithm by Saman, Abu Bakar Sayuti, Abdramane, Issa

    Published 2013
    “…It is found that the hybrid algorithm has improved the maze solving capabilities of the maze robot significantly…”
    Get full text
    Get full text
    Citation Index Journal
  7. 7

    Scheduling of batch process plant / Abdul Aziz Abu Bakar by Abu Bakar, Abdul Aziz

    Published 1995
    “…Basically this tool can successfully simulate the graphical presentation to solve the shortest path and K* shortest path problem.…”
    Get full text
    Get full text
    Student Project
  8. 8

    Solving vehicle routing problem by using improved K-nearest neighbor algorithm for best solution by Mohammed, Mazin Abed, Abd Ghani, Mohd Khanapi, Hamed, Raed Ibraheem, A. Mostafa, Salama, Ahmed Ibrahim, Dheyaa, Jameel, Humam Khaled, Alallah, Ahmed Hamed

    Published 2017
    “…The structure of the algorithm is designed so that the program does not require a large database to store the population, which speeds up the implementation of the program execution to obtain the solution; secondly, the algorithm has proven its success in solving the problem and finds a shortest route. …”
    Get full text
    Get full text
    Get full text
    Article
  9. 9
  10. 10
  11. 11
  12. 12

    An Enhanced Simulated Annealing Routing Algorithm for Semi-Diagonal Torus Network by Noraziah, Adzhar, Shaharuddin, Salleh

    Published 2017
    “…While this algorithm guarantees to find the shortest path for each single net, if it exists, each routed net will form obstacle for later paths. …”
    Get full text
    Get full text
    Get full text
    Article
  13. 13

    Optimum Time-Cost Trade-Off Strategies on Critical Path Method for Project Management by Khalaf, Wakas S.

    Published 2010
    “…Crashing in CPM means crashing one time unit from critical activity that has smallest cost slope while ensuring that the critical path is still the longest path in the project network. …”
    Get full text
    Get full text
    Thesis
  14. 14
  15. 15

    A web-based implementation of k-means algorithms by Lee, Quan

    Published 2022
    “…The project was planned using the Kanban development methodology, and was built using HTML, CSS, JavaScript, Django, NumPy and pandas. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  16. 16

    The solution of 2048 puzzle game using A* algorithm / Zafhira Ismail by Ismail, Zafhira

    Published 2017
    “…Experiment result proves high accuracy and efficiency from the proposed algorithm. For future work, besides the program providing the shortest path to minimize the possible movement to achieve game’s goal, the game could have a hint button attached to help the player.…”
    Get full text
    Get full text
    Thesis
  17. 17

    Smart appointment organizer for mobile application / Mohd Syafiq Adam by Adam, Mohd Syafiq

    Published 2009
    “…The development of this project is based on a framework of 5 main stages: planning, analysis, design, implementation and testing. …”
    Get full text
    Get full text
    Thesis
  18. 18

    Web-based clustering tool using fuzzy k-mean algorithm / Ahmad Zuladzlan Zulkifly by Zulkifly, Ahmad Zuladzlan

    Published 2019
    “…This methodology consist of Requirement and Planning, Design, Construction, Testing and Implementation. …”
    Get full text
    Get full text
    Thesis
  19. 19

    Soft computing approach for solving elevator scheduling problem by Norzatul Hajar, Abd Majid

    Published 2010
    “…It is formulated as an integer programming problem. In order to solve the scheduling problem on elevator, a genetic algorithm as part of soft computing is used in a real time system. …”
    Get full text
    Get full text
    Get full text
    Final Year Project Report / IMRAD
  20. 20

    Heavy Transportation Shortest Route using Dijkstra’s algorithm (HETRO) / Nurul Aqilah Ahmad Nezer by Ahmad Nezer, Nurul Aqilah

    Published 2017
    “…The development tools used in developing this project is NetBeans by using Java for the implementation of the coding. The methodology that used for developing this system is the Dijkstra’s algorithm. …”
    Get full text
    Get full text
    Thesis