Search Results - (( program solving delay algorithm ) OR ( java application model algorithm ))

Refine Results
  1. 1

    One-step block methods for solving ordinary and delay differential equations by Mohd Radzi, Hazwani

    Published 2011
    “…A new modified algorithm from the existing program for solving ODEs was developed. …”
    Get full text
    Get full text
    Thesis
  2. 2
  3. 3
  4. 4
  5. 5

    An iterative procedure for production-inventory-distribution routing problem by Dicky Lim, T.K., Moin, N.H.

    Published 2015
    “…We propose a MatHeuristic algorithm, an optimization algorithm made by the interpolation of metaheuristics and mathematical programming techniques, to solve the model. …”
    Get full text
    Get full text
    Conference or Workshop Item
  6. 6

    Formulating and solving stochastic truck and trailer routing problems using meta-heuristic algorithms / Seyedmehdi Mirmohammadsadeghi by Seyedmehdi, Mirmohammadsadeghi

    Published 2015
    “…Therefore, multi-point simulated annealing (M-SA), memetic algorithm (MA) and tabu search (TS) algorithms are applied to solve the TTRPSD. …”
    Get full text
    Get full text
    Get full text
    Thesis
  7. 7
  8. 8

    A headway and order scheme based mixed integer goal programming model for railway rescheduling / Zuraida Alwadood by Alwadood, Zuraida

    Published 2017
    “…A novel heuristic algorithm named as Headway and Order Scheme (HOS) is introduced to solve the rescheduling model. …”
    Get full text
    Get full text
    Thesis
  9. 9
  10. 10

    Real-time algorithmic music composition application. by Yap, Alisa Yi Hui

    Published 2022
    “…This project is about the study of evolutionary music, and focuses on the development of an algorithmic music composer using the Java programming language. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  11. 11

    Deterministic and stochastic inventory routing problems with backorders using artificial bee colony / Huda Zuhrah Ab Halim by Huda Zuhrah , Ab Halim

    Published 2019
    “…The DSIRP is modeled as stochastic dynamic programming and solved using a matheuristic, enhanced hybrid rollout algorithm. …”
    Get full text
    Get full text
    Get full text
    Thesis
  12. 12
  13. 13
  14. 14
  15. 15

    A Toolkit for Simulation of Desktop Grid Environment by FOROUSHAN, PAYAM CHINI

    Published 2014
    “…In this type of environment it is nearly impossible to prove the effectiveness of a scheduling algorithm. Hence the main objective of this study is to develop a desktop grid simulator toolkit for measuring and modeling scheduler algorithm performance. …”
    Get full text
    Get full text
    Final Year Project
  16. 16

    Secure Image Steganography Using Encryption Algorithm by Siti Dhalila, Mohd Satar, Roslinda, Muda, Fatimah, Ghazali, Mustafa, Mamat, Nazirah, Abd Hamid, An, P.K

    Published 2016
    “…The objective of this study is to enhance the confidentiality and security of the image steganography application by combining cryptography algorithm. In this proposed model, the RSA algorithm is used to encrypt a secret message into an unreadable ciphertext before hiding it in the image. …”
    Get full text
    Get full text
    Conference or Workshop Item
  17. 17

    A Feature Ranking Algorithm in Pragmatic Quality Factor Model for Software Quality Assessment by Ruzita, Ahmad

    Published 2013
    “…This thesis describes original research in the field of software quality model by presenting a Feature Ranking Algorithm (FRA) for Pragmatic Quality Factor (PQF) model. …”
    Get full text
    Get full text
    Get full text
    Thesis
  18. 18

    Integration of program evaluation and review technique (PERT), gantt chart and genetic algorithm in project management scheduling by Ahmad, Siti Hasziani

    Published 2014
    “…In this thesis, the discussion on the integration approach, which combines Program Evaluation and Review Technique (PERT), Gantt Chart (GC) and Genetic Algorithm (GA), is carried out. …”
    Get full text
    Get full text
    Get full text
    Thesis
  19. 19

    Development of an integrated scheduling model for handling equipment in automated port container terminals by Sadeghian, Syed Hamidreza

    Published 2014
    “…In addition, results proved that the modified meta-heuristic algorithm is able to find near optimal solutions and on average, the solutions found by the GA algorithm are only 0.2% worse than the optimal solutions and in the worst case in the test cases this difference is 2.3% which is acceptable. …”
    Get full text
    Get full text
    Thesis
  20. 20