Search Results - (( program reporting practices algorithm ) OR ( java application ant algorithm ))

Refine Results
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

    An alternative method to solve combined economic emission dispatch problems using flower pollination algorithm by Hong, Mee Song

    Published 2016
    “…CEED actually is a multi-objective problem and need complex programming to solve it. The problem becomes complicated when there is practical constraints to be considered as well. …”
    Get full text
    Get full text
    Thesis
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10

    Back propagation neural network approach for churn prediction: a case study in Celcom (M) Berhad / Hapida Husin by Husin, Hapida

    Published 2008
    “…The data has been chunk into a few series to determine the significant variables for predicting churn. Computer program were written in Matlab to implement the training and testing programs for the ANN algorithms. …”
    Get full text
    Get full text
    Thesis
  11. 11
  12. 12

    AI recommendation penetration testing tool for cross-site scripting: support vector machine algorithm by Salim, Nur Saadah, Saad, Shahadan

    Published 2025
    “…The research employs Extreme Programming (XP) methodologies to ensure high-quality code, agility, and collaborative development. …”
    Get full text
    Get full text
    Get full text
    Article
  13. 13
  14. 14
  15. 15
  16. 16

    A framework of test case prioritisation in regression testing using particle swarm-artificial bee colony algorithm by Ba-Quttayyan, Bakr Salim Abdullah

    Published 2024
    “…This research employed a modified version of the Design Science Research Methodology (DSRM), streamlined into five stages: problem identification, theoretical study, framework development, evaluation, and reporting. The developed framework, grounded in fault-based testing theory, comprises three key components: inputs, prioritization factors, and a prioritization algorithm. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  17. 17
  18. 18

    Development of an integrated scheduling model for handling equipment in automated port container terminals by Sadeghian, Syed Hamidreza

    Published 2014
    “…As the integrated scheduling of handling equipment is a “non-deterministic polynomialtime hard” (NP-hard) problem and also the computation time and ease of application are so important for real practices of the scheduling methods, So a meta-heuristic algorithm based on Genetic Algorithm is developed, in which, new operators create solutions considering the constraints of the problem and also a heuristic rule proposed which assigns the ALVs to the tasks. …”
    Get full text
    Get full text
    Thesis
  19. 19

    Design Rule Check To Validate Option Metal And Via For A Preprogrammed Layout Design by Oothayer Kumar, Sureindra Kumar

    Published 2014
    “…In order to enable the modification to be made quickly and enable worst case check, Practical Extraction and Report Language (PERL) programming used to automate the code. …”
    Get full text
    Get full text
    Thesis
  20. 20