Search Results - (( program 1 ((method algorithm) OR (path algorithm)) ) OR ( java implication tree algorithm ))

Refine Results
  1. 1
  2. 2

    Simulation of shortest path using a-star algorithm / Nurul Hani Nortaja by Nurul Hani , Nortaja

    Published 2004
    “…The development process for this simulation is using programming language of Microsoft Visual C I t 6.0 and the coding creation depends on the algorithm flowchart and the formula pseudocode. …”
    Get full text
    Get full text
    Thesis
  3. 3
  4. 4

    MAZE ROBOT: APPLYING AUTONOMOUS VEHICLE NAVIGATION ALGORITHM WITH EVENT-DRIVEN PROGRAMMING by ABDUL MALEK, NADHIRA

    Published 2011
    “…Event-driven programming method was applied in producing the maze navigation algorithm for the robot.…”
    Get full text
    Get full text
    Final Year Project
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9

    The solution of 2048 puzzle game using A* algorithm / Zafhira Ismail by Ismail, Zafhira

    Published 2017
    “…Experiment result proves high accuracy and efficiency from the proposed algorithm. For future work, besides the program providing the shortest path to minimize the possible movement to achieve game’s goal, the game could have a hint button attached to help the player.…”
    Get full text
    Get full text
    Thesis
  10. 10
  11. 11

    Solving vehicle routing problem by using improved K-nearest neighbor algorithm for best solution by Mohammed, Mazin Abed, Abd Ghani, Mohd Khanapi, Hamed, Raed Ibraheem, A. Mostafa, Salama, Ahmed Ibrahim, Dheyaa, Jameel, Humam Khaled, Alallah, Ahmed Hamed

    Published 2017
    “…The structure of the algorithm is designed so that the program does not require a large database to store the population, which speeds up the implementation of the program execution to obtain the solution; secondly, the algorithm has proven its success in solving the problem and finds a shortest route. …”
    Get full text
    Get full text
    Get full text
    Article
  12. 12
  13. 13
  14. 14

    Optimum Time-Cost Trade-Off Strategies on Critical Path Method for Project Management by Khalaf, Wakas S.

    Published 2010
    “…Crashing in CPM means crashing one time unit from critical activity that has smallest cost slope while ensuring that the critical path is still the longest path in the project network. …”
    Get full text
    Get full text
    Thesis
  15. 15

    Path Following Using A Learning Neural Network by NHH , Mohamad Hanif

    Published 2004
    “…Two algorithms, gradient descent and quasi-Newton which utilize a batch training method, are introduced as comparison to the gradient descent method that incorporates the online (or incremental) training method. …”
    Get full text
    Get full text
    Final Year Project
  16. 16

    Very Large Scale Integration Cell Based Path Extractor For Physical To Layout Mapping In Fault Isolation Work by Pragasam, Matthew

    Published 2017
    “…To be able to retrieve all possible signals involved within a suspected boundary is a popular search computational problem. Therefore the path extractor program proposed incorporates the characteristics of a depth-first search algorithm by considering the specifications of a cell-based design. …”
    Get full text
    Get full text
    Thesis
  17. 17
  18. 18
  19. 19
  20. 20