Search Results - (( problem using time algorithm ) OR ( java simulation optimization algorithm ))

Refine Results
  1. 1

    Enhancement of Ant Colony Optimization for Grid Job Scheduling and Load Balancing by Husna, Jamal Abdul Nasir

    Published 2011
    “…Global pheromone update is performed after the completion of processing the jobs in order to reduce the pheromone value of resources. A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against existing grid resource management algorithms such as Antz algorithm, Particle Swarm Optimization algorithm, Space Shared algorithm and Time Shared algorithm, in terms of processing time and resource utilization. …”
    Get full text
    Get full text
    Get full text
    Thesis
  2. 2

    Ant colony optimization algorithm for load balancing in grid computing by Ku-Mahamud, Ku Ruhana, Mohamed Din, Aniza

    Published 2012
    “…Global pheromone update is performed after the completion of processing the jobs in order to reduce the pheromone value of resources.A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against other ant based algorithm, in terms of resource utilization. …”
    Get full text
    Get full text
    Get full text
    Monograph
  3. 3

    Attribute reduction based scheduling algorithm with enhanced hybrid genetic algorithm and particle swarm optimization for optimal device selection by Nwogbaga, Nweso Emmanuel, Latip, Rohaya, Affendey, Lilly Suriani, Abdul Rahiman, Amir Rizaan

    Published 2022
    “…Offloading heavy data size to a remote node introduces the problem of additional delay due to transmission. Therefore, in this paper, we proposed Dynamic tasks scheduling algorithm based on attribute reduction with an enhanced hybrid Genetic Algorithm and Particle Swarm Optimization for optimal device selection. …”
    Get full text
    Get full text
    Article
  4. 4

    OPTIMIZED MIN-MIN TASK SCHEDULING ALGORITHM FOR SCIENTIFIC WORKFLOWS IN A CLOUD ENVIRONMENT by Murad S.S., Badeel R., Alsandi N.S.A., Alshaaya R.F., Ahmed R.A., Muhammed A., Derahman M.

    Published 2023
    “…The algorithms were implemented in a Java environment. Results were discussed and analyzed by using formulas and were compared in percentages. …”
    Review
  5. 5

    Resource management in grid computing using ant colony optimization by Ku-Mahamud, Ku Ruhana, Mohamed Din, Aniza

    Published 2011
    “…Resources with high pheromone value are selected to process the submitted jobs.Global pheromone update is performed after completion processing the jobs in order to reduce the pheromone value of resources.A simulation environment was developed using Java programming to test the performance of the proposed EACO algorithm against other ant based algorithm, in terms of resource utilization.Experimental results show that EACO produced better grid resource management solution.…”
    Get full text
    Get full text
    Get full text
    Get full text
    Monograph
  6. 6

    Embedded system for indoor guidance parking with Dijkstra’s algorithm and ant colony optimization by Mohammad Ata, Karimeh Ibrahim

    Published 2019
    “…This study proposes a car parking management system which applies Dijkstra’s algorithm, Ant Colony Optimization (ACO) and Binary Search Tree (BST) in structuring a guidance system for indoor parking. …”
    Get full text
    Get full text
    Thesis
  7. 7

    Features selection for intrusion detection system using hybridize PSO-SVM by Tabaan, Alaa Abdulrahman

    Published 2016
    “…Hybridize Particle Swarm Optimization (PSO) as a searching algorithm and support vector machine (SVM) as a classifier had been implemented to cope with this problem. …”
    Get full text
    Get full text
    Thesis
  8. 8

    Implementation of locust inspired scheduling algorithm with huge number of servers for energy efficiency in a cloud datacenter by Azhar, Nur Huwaina

    Published 2019
    “…Cloudsim is used as Discrete Event Simulation tool and Java as coding language to evaluate LACE algorithm. …”
    Get full text
    Get full text
    Thesis
  9. 9

    Optimized crossover genetic algorithm for vehicle routing problem with time windows by Nazif, Habibeh, Lee, Lai Soon

    Published 2010
    “…Conclusion/Recommendations: This study presented a genetic algorithm for solving vehicle routing problem with time windows using an optimized crossover operator. …”
    Get full text
    Get full text
    Get full text
    Article
  10. 10

    Investigation of evolutionary multi-objective algorithms in solving view selection problem / Seyed Hamid Talebian by Talebian, Seyed Hamid

    Published 2013
    “…In this research, we showed how evolutionary multi-objective algorithms can be used to solve the view selection problem and its advantage over classical optimization problems were described. …”
    Get full text
    Get full text
    Thesis
  11. 11

    Fast Finite Difference Time Domain Algorithms for Solving Antenna Application Problem by Hasan, Mohammad Khatim

    Published 2008
    “…These new parallel and sequential finite difference time domain (FDTD) algorithms yield from O(h2), ordinary O(h4) and weighted average O(h4) centered difference discretization using direct-domain and temporary-domain are used to solve problems mentioned above. …”
    Get full text
    Get full text
    Thesis
  12. 12

    Optimisation of vehicle routing problem with time windows using Harris Hawks optimiser by Chai, S. W., Kamaluddin, M. R., Ab Rashid, M. F. F.

    Published 2022
    “…The main objective of the study is to minimise the number of vehicles to be assigned for the routing problem subjected to the given time windows. The problem was optimised using a new algorithm known as Harris Hawks Optimiser (HHO). …”
    Get full text
    Get full text
    Get full text
    Article
  13. 13

    Solving time gap problems through the optimization of detecting stepping stone algorithm by Omar, Mohd. Nizam, Maarof, Mohd. Aizaini, Zainal, Anazida

    Published 2004
    “…Since the detecting stepping stone is listed as one of the response technique, it is suggested that the improved algorithm should be used as a remedial to the time gap problem.…”
    Get full text
    Get full text
    Book Section
  14. 14
  15. 15

    A genetic algorithm on single machine family scheduling problem to minimise total weighted completion time by Nazif, Habibeh, Lee, Lai Soon

    Published 2009
    “…For this problem, we propose a genetic algorithm using an optimised crossover operator designed by an undirected bipartite graph to find an optimal schedule which minimises the total weighted completion time of the jobs in the presence of the sequence independent family setup times. …”
    Get full text
    Get full text
    Article
  16. 16

    Development of optimization Alghorithm for uncertain non-linear dynamical system by Abdul Aziz, Mohd. Ismail, Yaacob, Nazeeruddin, Mohd. Said, Norfarizan, Hamzah, Nor Hazadura

    Published 2004
    “…Algorithms used to solve these problems are expected to satisfy the objectives consistently and since time translates into cost, must also be fast. …”
    Get full text
    Get full text
    Monograph
  17. 17

    Hybrid multiobjective genetic algorithm for integrated dynamic scheduling and routing of jobs and automated guided vehicles in flexible manufacturing systems by Umar, Umar Ali

    Published 2014
    “…Routing AGVs was proved to be NP-Complete and scheduling of jobs was also proved to be NP hard problems. The running time of any deterministic algorithms solving these types of problems increases very rapidly with the size of the problem, which can be many years with any computational resources available presently. …”
    Get full text
    Get full text
    Thesis
  18. 18
  19. 19

    Solving multi-objective dynamic vehicle routing problem with time windows using multi-objective algorithm by Khoo, Thau Soon

    Published 2022
    “…During the past decade, there is an increasing trend of published papers dealing with dynamic vehicle routing problems with time windows (DVRPTW) but not on multi-objective dynamic vehicle routing problems with time windows (MODVRPTW). …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  20. 20

    A genetic algorithm to minimise the maximum lateness on a single machine family scheduling problem by Lee, Lai Soon, Nazif, Habibeh

    Published 2009
    “…In this study, we propose an Optimised Crossover Genetic Algorithm (OCGA) for the problem. The objective is to find a schedule which minimises the maximum lateness of the jobs in the presence of the sequence independent family setup times.In brief, the proposed OCGA uses binary representation to encode the problem. …”
    Get full text
    Conference or Workshop Item