Published 2015
“…The study uses the Shortest Path method of the network
flow models and identifies the optimum capacity required in each period of the planning horizon using Dijikstra’s
Algorithm. Two non-linear, zero-one
integer
programming models have been developed – first one is the Confined Workforce Planning (CWP) model in which cost for changing the workforce strength is assumed as uniform and the second, a Confined Workforce Planning with Plugging
(CWPP) model where workforce changing cost is non-uniform. …”
Get full text
Get full text
Get full text
Get full text
Thesis