Search Results - (( java implementation using algorithm ) OR ( planning process solving algorithm ))

Refine Results
  1. 1

    RSA Encryption & Decryption using JAVA by Ramli, Marliyana

    Published 2006
    “…References and theories to support the research of 'RSA Encryption/Decryption using Java' have been disclosed in Literature Review section. …”
    Get full text
    Get full text
    Final Year Project
  2. 2

    Provider independent cryptographic tools by Ibrahim, Subariah, Salleh, Mazleena, Abdul Aziz, Shah Rizan

    Published 2003
    “…The library is implemented by using Java cryptographic service provider framework that conforms to Java Cryptographic Architecture (JCA) and Java Cryptographic Extension (JCE). …”
    Get full text
    Get full text
    Get full text
    Monograph
  3. 3

    Direct approach for mining association rules from structured XML data by Abazeed, Ashraf Riad

    Published 2012
    “…The thesis also provides a two different implementation of the modified FLEX algorithm using a java based parsers and XQuery implementation. …”
    Get full text
    Get full text
    Thesis
  4. 4

    Plagiarism Detection System for Java Programming Assignments by Using Greedy String-Tilling Algorithm by Norulazmi, Kasim

    Published 2008
    “…The prototype system, known as Java Plagiarism Detection System (JPDS) implements the Greedy-String-Tiling algorithm to detect similarities among tokens in a Java source code files. …”
    Get full text
    Get full text
    Get full text
    Thesis
  5. 5

    Bees algorithm for Forest transportation planning optimization in Malaysia by Jamaluddin, Jamhuri, Kamarudin, Norizah, Ismail, Mohd Hasmadi, Ahmad, Siti Azfanizam

    Published 2021
    “…Algorithm is widely used in various areas due to its ability to solve classes of problems. …”
    Get full text
    Get full text
    Article
  6. 6

    Gravitational Search Algorithm for Assembly Sequence Planning by Ismail, Ibrahim, Zuwairie, Ibrahim, Hamzah, Ahmad, Mohd Falfazli, Mat Jusof, Zulkifli, Md. Yusof, Sophan Wahyudi, Nawawi, Marizan, Mubin

    Published 2014
    “…In this paper, an approach using Gravitational Search Algorithm (GSA) which is a heuristic optimization algorithm that incorporates the Newton’s law of gravity and the law of motion into analytical studies of systems is proposed to solve the assembly sequence planning problem. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  7. 7

    Performance evaluation of real-time multiprocessor scheduling algorithms by Alhussian, H., Zakaria, N., Abdulkadir, S.J., Fageeri, S.O.

    Published 2016
    “…We hyave used the CPU profiler of Oracle JavaTM VisualVM to monitor the execution of LRE-TL as well as USG algorithms. …”
    Get full text
    Get full text
    Conference or Workshop Item
  8. 8

    Automatic Number Plate Recognition on android platform: With some Java code excerpts by ., Abdul Mutholib, Gunawan, Teddy Surya, Kartiwi, Mira

    Published 2016
    “…On the other hand, the traditional algorithm using template matching only obtained 83.65% recognition rate with 0.97 second processing time. …”
    Get full text
    Get full text
    Get full text
    Book
  9. 9

    Audio Streaming System Using Real-Time Transport Protocol Based on Java Media Framework by Asaad Aref, Ibrahim

    Published 2004
    “…Java Media Framework library and the RTP protocol for audio transmission were used as development tools.The developed system designed in this thesis together with experimental results proved that the system could be implemented successfully. …”
    Get full text
    Get full text
    Thesis
  10. 10
  11. 11
  12. 12
  13. 13

    The development of integrated planning and scheduling framework for dynamic and reactive environment of complex manufacturing problem by Zakaria, Zalmiyah, Deris, Safaai, Mat Yatim, Safie, Othman, Muhamad Razib

    Published 2008
    “…Firstly, in Chapter 1, we give an overview of the real problem occurred in the field of dynamic scheduling. A hybrid genetic algorithm (HGA) for solving the dynamic job shop problem is proposed to solve the dynamic scheduling. …”
    Get full text
    Get full text
    Get full text
    Monograph
  14. 14

    Café Web Based System Using Priority Scheduling Approach by Fatimah, Ghazali, Rohana, Ismail, Mohamad Hariz, Hasni

    Published 2017
    “…The system is implemented at UniSZA’s café where two different types of user will use the system. …”
    Get full text
    Get full text
    Conference or Workshop Item
  15. 15

    A Toolkit for Simulation of Desktop Grid Environment by FOROUSHAN, PAYAM CHINI

    Published 2014
    “…A simulator for desktop grid environment has been developed using Java as the implementation language due to its wide popularity. …”
    Get full text
    Get full text
    Final Year Project
  16. 16

    Parallel metaheuristic algorithm for route planning using CUDA by Looi, Daniel Jun Jie

    Published 2025
    “…This research will be focusing on developing a Parallel Metaheuristic Algorithm for Route Planning using CUDA to improve the efficiency and performance of route planning. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  17. 17
  18. 18

    An assembly sequence planning approach with a rule-based multi-state gravitational search algorithm by Ibrahim, I., Ibrahim, Z., Ahmad, Hamzah, Jusof, M.F.M., Yusof, Z.M., Nawawi, S.W., Mubin, M.

    Published 2015
    “…In this paper, an approach based on a new variant of the gravitational search algorithm (GSA) called the rule-based multi-state gravitational search algorithm (RBMSGSA) is used to solve the assembly sequence planning problem. …”
    Get full text
    Get full text
    Get full text
    Article
  19. 19

    An Assembly Sequence Planning Approach with a Rule-based Multi-state Gravitational Search Algorithm by Ismail, Ibrahim, Zuwairie, Ibrahim, Hamzah, Ahmad, Mohd Falfazli, Mat Jusof, Zulkifli, Md. Yusof, Sophan Wahyudi, Nawawi, Marizan, Mubin

    Published 2015
    “…In this paper, an approach based on a new variant of the gravitational search algorithm (GSA) called the rule-based multi-state gravitational search algorithm (RBMSGSA) is used to solve the assembly sequence planning problem. …”
    Get full text
    Get full text
    Get full text
    Article
  20. 20

    Implementation of locust inspired scheduling algorithm with huge number of servers for energy efficiency in a cloud datacenter by Azhar, Nur Huwaina

    Published 2019
    “…Cloudsim is used as Discrete Event Simulation tool and Java as coding language to evaluate LACE algorithm. …”
    Get full text
    Get full text
    Thesis