Search Results - (( java implementation plan algorithm ) OR ( using program planning algorithm ))

Refine Results
  1. 1

    Songs Search Using Human Humming Voice by Abdul Rahman, Mohamad Ariff

    Published 2007
    “…Java programming language is used to build the system. …”
    Get full text
    Get full text
    Final Year Project
  2. 2

    A web-based implementation of k-means algorithms by Lee, Quan

    Published 2022
    “…The project was planned using the Kanban development methodology, and was built using HTML, CSS, JavaScript, Django, NumPy and pandas. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  3. 3

    Smart appointment organizer for mobile application / Mohd Syafiq Adam by Adam, Mohd Syafiq

    Published 2009
    “…The development of this project is based on a framework of 5 main stages: planning, analysis, design, implementation and testing. …”
    Get full text
    Get full text
    Thesis
  4. 4

    Web-based clustering tool using fuzzy k-mean algorithm / Ahmad Zuladzlan Zulkifly by Zulkifly, Ahmad Zuladzlan

    Published 2019
    “…This methodology consist of Requirement and Planning, Design, Construction, Testing and Implementation. …”
    Get full text
    Get full text
    Thesis
  5. 5

    Heavy Transportation Shortest Route using Dijkstra’s algorithm (HETRO) / Nurul Aqilah Ahmad Nezer by Ahmad Nezer, Nurul Aqilah

    Published 2017
    “…The development tools used in developing this project is NetBeans by using Java for the implementation of the coding. The methodology that used for developing this system is the Dijkstra’s algorithm. …”
    Get full text
    Get full text
    Thesis
  6. 6

    Path planning for unmanned aerial vehicle (UAV) using rotated accelerated method in static outdoor environment by Shaliza Hayati A. Wahab, Nordin Saad, Azali Saudi, Ali Chekima

    Published 2021
    “…In this study, a fast iterative method known as Rotated Successive Over-Relaxation (RSOR) is introduced. The algorithm is implemented in a self-developed 2D Java tool, UAV Planner. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  7. 7

    Implementation of RIO in UMJaNetSim / Chan Chin We by Chan, Chin We

    Published 2004
    “…In this project, I will do some research on the recent TCP congestion control and avoidance mechanisms and implement one of the mechanisms into the Java Network Simulator (JaNetSim). …”
    Get full text
    Get full text
    Thesis
  8. 8
  9. 9

    Path planning algorithm for a car like robot based on MILP method by Mohd Sadri, Mohd Pawzi

    Published 2013
    “…This project is presents an algorithm for path planning optimal routes mobile robot “like a car” to a target in unknown environment. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  10. 10
  11. 11

    Application of Shuffled Frog Leaping Algorithm (SFLA) to long term generation expansion planning / Nurul Ulya Ibrahim by Ibrahim, Nurul Ulya

    Published 2016
    “…The proposed SFLA in this study is developed using Matlab programming. This method is tested for 15 existing power plant and five generation candidates within 10 years of planning. …”
    Get full text
    Get full text
    Thesis
  12. 12

    Development of dynamic programming algorithm for maintenance scheduling problem by Zafira Adlia, Mohd Fauzi

    Published 2020
    “…Using the dynamic programming algorithm developed, the model was also able to recalculate alternative schedules by replacing unavailable teams with other teams to avoid delays. …”
    Get full text
    Get full text
    Thesis
  13. 13
  14. 14

    MOTION PLANNING ALGORITHM FOR VEHICLE PARKING SIMULATION by Mohd Hilmi, Amirul Ehsan

    Published 2008
    “…This project focuses on creation of the motion planning algorithm of the system and developing a simulation to simulate the vehicle movements. …”
    Get full text
    Get full text
    Final Year Project
  15. 15

    Vision-based robot indoor navigation by Teo, Zhin Hang

    Published 2022
    “…This project aims to develop a vision-based navigation robot using OpenCV and C++ programming language in an indoor environment. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  16. 16

    Long-term optimal planning of distributed generations and battery energy storage systems towards high integration of green energy considering uncertainty and demand response progra... by Ba-swaimi S., Verayiah R., Ramachandaramurthy V.K., ALAhmad A.K.

    Published 2025
    “…The proposed model has been considered planning for ten years, and this was simulated and validated on the IEEE 33-bus radial DS using MATLAB R2023b. …”
    Article
  17. 17

    Urban connected vehicle lane planning based on improved Frank Wolfe algorithm by Anqi, Jiang, Faziawati, Abdul Aziz, Norsidah, Ujang, Mohd Afzan, Mohamed

    Published 2025
    “…Then, the upper-level model is solved using improved whale optimization, and the lower-level model is solved using improved Frank-Wolfe algorithm. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  18. 18

    Urban connected vehicle lane planning based on improved Frank Wolfe algorithm by Jiang, Anqi, Abdul Aziz, Faziawati, Ujang, Norsidah, Mohamed, Mohd Afzan

    Published 2025
    “…Then, the upper-level model is solved using improved whale optimization, and the lower-level model is solved using improved Frank-Wolfe algorithm. …”
    Get full text
    Get full text
    Get full text
    Article
  19. 19
  20. 20