Search Results - (( java implementation plan algorithm ) OR ( using continuous using algorithm ))
Search alternatives:
- java implementation »
- implementation plan »
- continuous using »
- using algorithm »
- plan algorithm »
-
1
A web-based implementation of k-means algorithms
Published 2022“…The project was planned using the Kanban development methodology, and was built using HTML, CSS, JavaScript, Django, NumPy and pandas. …”
Get full text
Get full text
Final Year Project / Dissertation / Thesis -
2
Fuzzy-based multi-agent approach for reliability assessment and improvement of power system protection
Published 2015“…The simulation results for the first and second models are done using the data obtained from Malaysia distribution network (DISCO-Net) and 69 bus test system that were implemented using Java Agent Development Framework package software. …”
Get full text
Get full text
Thesis -
3
Smart appointment organizer for mobile application / Mohd Syafiq Adam
Published 2009“…The development of this project is based on a framework of 5 main stages: planning, analysis, design, implementation and testing. …”
Get full text
Get full text
Thesis -
4
Web-based clustering tool using fuzzy k-mean algorithm / Ahmad Zuladzlan Zulkifly
Published 2019“…This methodology consist of Requirement and Planning, Design, Construction, Testing and Implementation. …”
Get full text
Get full text
Thesis -
5
Heavy Transportation Shortest Route using Dijkstra’s algorithm (HETRO) / Nurul Aqilah Ahmad Nezer
Published 2017“…The development tools used in developing this project is NetBeans by using Java for the implementation of the coding. The methodology that used for developing this system is the Dijkstra’s algorithm. …”
Get full text
Get full text
Thesis -
6
Path planning for unmanned aerial vehicle (UAV) using rotated accelerated method in static outdoor environment
Published 2021“…In this study, a fast iterative method known as Rotated Successive Over-Relaxation (RSOR) is introduced. The algorithm is implemented in a self-developed 2D Java tool, UAV Planner. …”
Get full text
Get full text
Get full text
Get full text
Article -
7
Implementation of RIO in UMJaNetSim / Chan Chin We
Published 2004“…In this project, I will do some research on the recent TCP congestion control and avoidance mechanisms and implement one of the mechanisms into the Java Network Simulator (JaNetSim). …”
Get full text
Get full text
Thesis -
8
Songs Search Using Human Humming Voice
Published 2007“…The scopes for this project are human humming voice, voice capture in WA V format, songs database, and MIDI file comparing algorithm. Methodologies used in this system are based on system analysis and design methodology comprising planning, analysis, design and implementation. …”
Get full text
Get full text
Final Year Project -
9
Identification of continuous-time hammerstein system using sine cosine algorithm
Published 2019“…This paper presents the development of identification of continuous-time Hammerstein systems based on Sine Cosine Algorithm (SCA). …”
Get full text
Get full text
Get full text
Get full text
Conference or Workshop Item -
10
Thermoelectric cooler identification based on continuous-time hammerstein model using metaheuristics algorithm
Published 2021“…This paper presents the identification of the Thermoelectric Cooler (TEC) plant using a novel metaheuristic called hybrid Multi-Verse Optimizer with Sine Cosine Algorithm (hMVOSCA) based continuous-time Hammerstein model. …”
Get full text
Get full text
Get full text
Get full text
Conference or Workshop Item -
11
Smart student timetable planner
Published 2025“…To achieve these objectives, the system adopts the Rapid Application Development (RAD) methodology, ensuring iterative design, prototyping, and user feedback integration throughout the process. The system is implemented using Node.js with Express for server-side development, HTML, CSS, and JavaScript for the frontend, and Socket.IO for real-time collaboration. …”
Get full text
Get full text
Final Year Project / Dissertation / Thesis -
12
Curve fitting by rational cubic Bézier with C1 and G1 continuity using metaheuristics methods
Published 2019“…Rational cubic Bézier curves are used to approximate the data sets while minimizing the least-squares error function using different metaheuristics algorithms. …”
Get full text
Get full text
Get full text
Conference or Workshop Item -
13
Real time power quality event detection using continuous wavelet transform
Published 2023“…A test bench setup with voltage sag generator is used to test the performance of the proposed algorithm. …”
Conference paper -
14
Formulating new enhanced pattern classification algorithms based on ACO-SVM
Published 2013“…ACO originally deals with discrete optimization problem.In applying ACO for solving SVM model selection problem which are continuous variables, there is a need to discretize the continuously value into discrete values.This discretization process would result in loss of some information and hence affects the classification accuracy and seeking time.In this algorithm we propose to solve SVM model selection problem using IACOR without the need to discretize continuous value for SVM.The second algorithm aims to simultaneously solve SVM model selection problem and selects a small number of features.SVM model selection and selection of suitable and small number of feature subsets must occur simultaneously because error produced from the feature subset selection phase will affect the values of SVM model selection and result in low classification accuracy.In this second algorithm we propose the use of IACOMV to simultaneously solve SVM model selection problem and features subset selection.Ten benchmark datasets were used to evaluate the proposed algorithms.Results showed that the proposed algorithms can enhance the classification accuracy with small size of features subset.…”
Get full text
Get full text
Get full text
Article -
15
A Continuous Overlay Path Probing Algorithm For Overlay Networks
Published 2013“…Several experiments were carried out using the OMNeT++ simulation framework. The designed algorithm was evaluated using experimental data. …”
Get full text
Get full text
Thesis -
16
Identification of continuous-time hammerstein model using improved archimedes optimization algorithm
Published 2024“…This proposed algorithm also discerned linear and nonlinear subsystem variables within a continuous-time Hammerstein model utilizing input and output data. …”
Get full text
Get full text
Get full text
Get full text
Article -
17
Classification of breast cancer disease using bagging fuzzy-id3 algorithm based on fuzzydbd
Published 2022“…There are various decision tree algorithms, but the most commonly used are Iterative Dichotomiser 3 (ID3), CART, and C4.5. …”
Get full text
Get full text
Thesis -
18
Identification of continuous-time model of hammerstein system using modified multi-verse optimizer
Published 2021“…his thesis implements a novel nature-inspired metaheuristic optimization algorithm, namely the modified Multi-Verse Optimizer (mMVO) algorithm, to identify the continuous-time model of Hammerstein system. …”
Get full text
Get full text
Thesis -
19
Modification of particle swarm optimization algorithm for optimization of discrete values
Published 2011“…We propose a novel modification to the PSO algorithm to perform rapid discrete optimization. The proposed Discrete-PSO method (DPSO) uses a rescaling equation to convert the continuous-valued positions into discrete-valued variables. …”
Get full text
Get full text
Research Reports -
20
Continuation power flow for voltage stability assessment / Mohd Zamri Laton
Published 2006“…The continuation power flow program is developed using MATLAB programming language base on algorithm of continuation power flow (CPF) technique, which can compute efficiently the parameter at saddle node bifurcation point. …”
Get full text
Get full text
Thesis
