Search Results - (( java implementation plan algorithm ) OR ( programming problem walking algorithm ))
Search alternatives:
- java implementation »
- implementation plan »
- walking algorithm »
- problem walking »
- plan algorithm »
-
1
-
2
A web-based implementation of k-means algorithms
Published 2022“…The project was planned using the Kanban development methodology, and was built using HTML, CSS, JavaScript, Django, NumPy and pandas. …”
Get full text
Get full text
Final Year Project / Dissertation / Thesis -
3
Smart appointment organizer for mobile application / Mohd Syafiq Adam
Published 2009“…The development of this project is based on a framework of 5 main stages: planning, analysis, design, implementation and testing. …”
Get full text
Get full text
Thesis -
4
Web-based clustering tool using fuzzy k-mean algorithm / Ahmad Zuladzlan Zulkifly
Published 2019“…This methodology consist of Requirement and Planning, Design, Construction, Testing and Implementation. …”
Get full text
Get full text
Thesis -
5
Framework for pedestrian walking behaviour recognition to minimize road accident
Published 2021“…Pedestrian walking misbehaviour represents a severe problem to road safety. …”
Get full text
Get full text
Get full text
Get full text
Thesis -
6
Framework for pedestrian walking behaviour recognition to minimize road accident
Published 2021“…Pedestrian walking misbehaviour represents a severe problem to road safety. …”
Get full text
Get full text
Get full text
Get full text
Thesis -
7
Heavy Transportation Shortest Route using Dijkstra’s algorithm (HETRO) / Nurul Aqilah Ahmad Nezer
Published 2017“…The development tools used in developing this project is NetBeans by using Java for the implementation of the coding. The methodology that used for developing this system is the Dijkstra’s algorithm. …”
Get full text
Get full text
Thesis -
8
Path planning for unmanned aerial vehicle (UAV) using rotated accelerated method in static outdoor environment
Published 2021“…In this study, a fast iterative method known as Rotated Successive Over-Relaxation (RSOR) is introduced. The algorithm is implemented in a self-developed 2D Java tool, UAV Planner. …”
Get full text
Get full text
Get full text
Get full text
Article -
9
Implementation of RIO in UMJaNetSim / Chan Chin We
Published 2004“…In this project, I will do some research on the recent TCP congestion control and avoidance mechanisms and implement one of the mechanisms into the Java Network Simulator (JaNetSim). …”
Get full text
Get full text
Thesis -
10
Songs Search Using Human Humming Voice
Published 2007“…The scopes for this project are human humming voice, voice capture in WA V format, songs database, and MIDI file comparing algorithm. Methodologies used in this system are based on system analysis and design methodology comprising planning, analysis, design and implementation. …”
Get full text
Get full text
Final Year Project -
11
Automated pavement imaging program (APIP) for pavement cracks classification and quantification – a photogrammetric approach
Published 2008“…The digital image processing program enables longitudinal, transverse, and alligator cracking to be classified. …”
Get full text
Get full text
Get full text
Conference or Workshop Item -
12
Smart student timetable planner
Published 2025“…To achieve these objectives, the system adopts the Rapid Application Development (RAD) methodology, ensuring iterative design, prototyping, and user feedback integration throughout the process. The system is implemented using Node.js with Express for server-side development, HTML, CSS, and JavaScript for the frontend, and Socket.IO for real-time collaboration. …”
Get full text
Get full text
Final Year Project / Dissertation / Thesis -
13
Evaluation of cracks and disintegrations using close-range digital photogrammetry and image processing technique
Published 2005“…The digital image processing program enables longitudinal, transverse, and alligator cracking to be classified. …”
Get full text
Get full text
Thesis -
14
Ant lion optimizer for solving unit commitment with solar photovoltaic integration / Izni Nadhirah Sam’on
Published 2020“…The performance of the proposed algorithm is compared with the performance of Dynamic Programming (DP) technique in terms of generation scheduling, total operating cost (TOC) and computation time. …”
Get full text
Get full text
Thesis -
15
Fuzzy-based multi-agent approach for reliability assessment and improvement of power system protection
Published 2015“…The simulation results for the first and second models are done using the data obtained from Malaysia distribution network (DISCO-Net) and 69 bus test system that were implemented using Java Agent Development Framework package software. …”
Get full text
Get full text
Thesis
