Search Results - (( java implementation plan algorithm ) OR ( parameter estimation replication algorithm ))

  • Showing 1 - 12 results of 12
Refine Results
  1. 1

    Estimation of the Epidemiological Parameter for the COVID-19 Outbreak by Muhammad Fahmi, Ahmad Zuber, Norhayati, Rosli, Noryanti, Muhammad

    Published 2024
    “…In this study, we propose a Metropolis-Hastings algorithm of the Markov Chain Monte Carlo (MCMC) method to estimate the epidemiological parameters of infectious rate, fatality rate, recovery rate, and reproduction numbers. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  2. 2

    COMPARATIVE ANALYSIS OF OPTICAL FLOW MEASUREMENT TECHNIQUE by NIZAM AKBAR, AMAR NAZMI ZULKARNAIN

    Published 2017
    “…The main motivation of this research is to do a comparative analysis of the four cross correlation algorithm as mentioned above. The four algorithms were used to estimate the flow rate where five simulations with five different flow rates were measured in order to determine the accuracy of each algorithm. …”
    Get full text
    Get full text
    Final Year Project
  3. 3

    A web-based implementation of k-means algorithms by Lee, Quan

    Published 2022
    “…The project was planned using the Kanban development methodology, and was built using HTML, CSS, JavaScript, Django, NumPy and pandas. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  4. 4

    Smart appointment organizer for mobile application / Mohd Syafiq Adam by Adam, Mohd Syafiq

    Published 2009
    “…The development of this project is based on a framework of 5 main stages: planning, analysis, design, implementation and testing. …”
    Get full text
    Get full text
    Thesis
  5. 5

    Web-based clustering tool using fuzzy k-mean algorithm / Ahmad Zuladzlan Zulkifly by Zulkifly, Ahmad Zuladzlan

    Published 2019
    “…This methodology consist of Requirement and Planning, Design, Construction, Testing and Implementation. …”
    Get full text
    Get full text
    Thesis
  6. 6

    Heavy Transportation Shortest Route using Dijkstra’s algorithm (HETRO) / Nurul Aqilah Ahmad Nezer by Ahmad Nezer, Nurul Aqilah

    Published 2017
    “…The development tools used in developing this project is NetBeans by using Java for the implementation of the coding. The methodology that used for developing this system is the Dijkstra’s algorithm. …”
    Get full text
    Get full text
    Thesis
  7. 7

    Path planning for unmanned aerial vehicle (UAV) using rotated accelerated method in static outdoor environment by Shaliza Hayati A. Wahab, Nordin Saad, Azali Saudi, Ali Chekima

    Published 2021
    “…In this study, a fast iterative method known as Rotated Successive Over-Relaxation (RSOR) is introduced. The algorithm is implemented in a self-developed 2D Java tool, UAV Planner. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  8. 8

    Implementation of RIO in UMJaNetSim / Chan Chin We by Chan, Chin We

    Published 2004
    “…In this project, I will do some research on the recent TCP congestion control and avoidance mechanisms and implement one of the mechanisms into the Java Network Simulator (JaNetSim). …”
    Get full text
    Get full text
    Thesis
  9. 9

    Songs Search Using Human Humming Voice by Abdul Rahman, Mohamad Ariff

    Published 2007
    “…The scopes for this project are human humming voice, voice capture in WA V format, songs database, and MIDI file comparing algorithm. Methodologies used in this system are based on system analysis and design methodology comprising planning, analysis, design and implementation. …”
    Get full text
    Get full text
    Final Year Project
  10. 10

    Smart student timetable planner by Wong, Xin Tong

    Published 2025
    “…To achieve these objectives, the system adopts the Rapid Application Development (RAD) methodology, ensuring iterative design, prototyping, and user feedback integration throughout the process. The system is implemented using Node.js with Express for server-side development, HTML, CSS, and JavaScript for the frontend, and Socket.IO for real-time collaboration. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  11. 11

    Comparison between specifications of linear regression and spatial-temporal autoregressive models in mass appraisal valuation for single storey residential property by Jahanshiri, Ebrahim

    Published 2013
    “…Effects such as normality treatment, definition of neighbourhoods and weights and choice of autocorrelation parameter and parameter estimation are some of the complexities that are inherent to these models. …”
    Get full text
    Get full text
    Thesis
  12. 12

    Fuzzy-based multi-agent approach for reliability assessment and improvement of power system protection by Nadheer Abdulridha, Shalash

    Published 2015
    “…The simulation results for the first and second models are done using the data obtained from Malaysia distribution network (DISCO-Net) and 69 bus test system that were implemented using Java Agent Development Framework package software. …”
    Get full text
    Get full text
    Thesis