Search Results - (( java implementation plan algorithm ) OR ( basic reporting path algorithm ))
Search alternatives:
- java implementation »
- implementation plan »
- plan algorithm »
- reporting path »
- path algorithm »
-
1
Synthesis of transistor chaining algorithm for CMOS cell layout using euler path / Sukri Hanafiah
Published 1997“…The comparison between euler's path and Bipartite graph Algorithm [14] will be made at the end this of this report to see which one give optimal chaining .…”
Get full text
Get full text
Thesis -
2
-
3
Implementation of an autonomous mobile robot navigation algorithm using C language
Published 2009“…This report basically discusses the study and also work that has been done from previous of the chosen topic, which is Implementation of an Autonomous Mobile Robot Navigation Algorithm using 'C' language. …”
Get full text
Get full text
Final Year Project -
4
-
5
A web-based implementation of k-means algorithms
Published 2022“…The project was planned using the Kanban development methodology, and was built using HTML, CSS, JavaScript, Django, NumPy and pandas. …”
Get full text
Get full text
Final Year Project / Dissertation / Thesis -
6
Smart appointment organizer for mobile application / Mohd Syafiq Adam
Published 2009“…The development of this project is based on a framework of 5 main stages: planning, analysis, design, implementation and testing. …”
Get full text
Get full text
Thesis -
7
Web-based clustering tool using fuzzy k-mean algorithm / Ahmad Zuladzlan Zulkifly
Published 2019“…This methodology consist of Requirement and Planning, Design, Construction, Testing and Implementation. …”
Get full text
Get full text
Thesis -
8
Heavy Transportation Shortest Route using Dijkstra’s algorithm (HETRO) / Nurul Aqilah Ahmad Nezer
Published 2017“…The development tools used in developing this project is NetBeans by using Java for the implementation of the coding. The methodology that used for developing this system is the Dijkstra’s algorithm. …”
Get full text
Get full text
Thesis -
9
Path planning for unmanned aerial vehicle (UAV) using rotated accelerated method in static outdoor environment
Published 2021“…In this study, a fast iterative method known as Rotated Successive Over-Relaxation (RSOR) is introduced. The algorithm is implemented in a self-developed 2D Java tool, UAV Planner. …”
Get full text
Get full text
Get full text
Get full text
Article -
10
Implementation of RIO in UMJaNetSim / Chan Chin We
Published 2004“…In this project, I will do some research on the recent TCP congestion control and avoidance mechanisms and implement one of the mechanisms into the Java Network Simulator (JaNetSim). …”
Get full text
Get full text
Thesis -
11
Songs Search Using Human Humming Voice
Published 2007“…The scopes for this project are human humming voice, voice capture in WA V format, songs database, and MIDI file comparing algorithm. Methodologies used in this system are based on system analysis and design methodology comprising planning, analysis, design and implementation. …”
Get full text
Get full text
Final Year Project -
12
Travelling Salesman Problem using Prim Algorithm in High Performance Computing
Published 2007“…This preliminary report emphasizes on the basic terms of the efficient job scheduling algorithm for traveling salesman problem in high performance computing. …”
Get full text
Get full text
Final Year Project -
13
Mobile Robot with Navigation Control and Communication
Published 2016Get full text
Get full text
Final Year Project -
14
Smart student timetable planner
Published 2025“…To achieve these objectives, the system adopts the Rapid Application Development (RAD) methodology, ensuring iterative design, prototyping, and user feedback integration throughout the process. The system is implemented using Node.js with Express for server-side development, HTML, CSS, and JavaScript for the frontend, and Socket.IO for real-time collaboration. …”
Get full text
Get full text
Final Year Project / Dissertation / Thesis -
15
MOTION TARGET TRACKING OF MOBILE ROBOTS
Published 2015“…The main hardware and has been tested with basic programs based on the algorithms of the said methods. …”
Get full text
Get full text
Final Year Project -
16
Fuzzy-based multi-agent approach for reliability assessment and improvement of power system protection
Published 2015“…The simulation results for the first and second models are done using the data obtained from Malaysia distribution network (DISCO-Net) and 69 bus test system that were implemented using Java Agent Development Framework package software. …”
Get full text
Get full text
Thesis
