Search Results - (( java implementation phase algorithm ) OR ( program predictive scheduling algorithm ))

  • Showing 1 - 10 results of 10
Refine Results
  1. 1

    Web-based clustering tool using fuzzy k-mean algorithm / Ahmad Zuladzlan Zulkifly by Zulkifly, Ahmad Zuladzlan

    Published 2019
    “…All the algorithm for the engine has been developed by using Java script language. …”
    Get full text
    Get full text
    Thesis
  2. 2

    Integrated Scheduling and RTO of RGP with MPC and PI Controllers by Yusoff, Nooryusmiza, Ramasamy , Marappagounder

    Published 2009
    “…Optimal trajectories of set points are obtained using sequential quadratic programming algorithm with constraints. These trajectories are disjointedly implemented by model predictive control (MPC) scheme and proportional-integral (PI) controllers for comparison. …”
    Get full text
    Get full text
    Conference or Workshop Item
  3. 3

    Integrated Scheduling and RTO of RGP with MPC and PI Controllers by Yusoff, Nooryusmiza, Ramasamy , Marappagounder

    Published 2009
    “…Optimal trajectories of set points are obtained using sequential quadratic programming algorithm with constraints. These trajectories are disjointedly implemented by model predictive control (MPC) scheme and proportional-integral (PI) controllers for comparison. …”
    Get full text
    Get full text
    Conference or Workshop Item
  4. 4

    Integrated scheduling and RTO of RGP with MPC and PI controllers by Yusoff, Nooryusmiza, Ramasamy , Marappagounder

    Published 2009
    “…Optimal trajectories of set points are obtained using sequential quadratic programming algorithm with constraints. These trajectories are disjointedly implemented by Model Predictive Control (MPC) scheme and Proportional-Integral (PI) controllers for comparison. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Citation Index Journal
  5. 5

    Application of Artificial Neural Networks (ANN) for unit commitment prediction / Robert Engkiau by Engkiau, Robert

    Published 2003
    “…Results from existing Genetic Algorithm (GA) program were used as the NN training and testing data set. …”
    Get full text
    Get full text
    Thesis
  6. 6

    Optimal route checking using genetic algorithm for UiTM's bus services / Tengku Salman Fathi Tengku Jaafar by Tengku Jaafar, Tengku Salman Fathi

    Published 2006
    “…Although from human logical thinking, the route can be generated easily but the calculation of checking the route whether it is optimal route or not is difficult and will take long time to be implemented. This research study with the development of the Optimal Route Checking Using Genetic Algorithm system should solve this scenario. …”
    Get full text
    Get full text
    Thesis
  7. 7

    Mathematical simulation for 3-dimensional temperature visualization on open source-based grid computing platform by Alias, Norma, Satam, Noriza, Abd. Ghaffar, Zarith Safiza, Darwis, Roziha, Hamzah, Norhafiza, Islam, Md. Rajibul

    Published 2009
    “…New Iterative Alternating Group Explicit (NAGE) is a powerful parallel numerical algorithm for multidimensional temperature prediction. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  8. 8

    Hybrid evolutionarybarnacles mating optimisation-artificial neural network based technique for solving economic power dispatch planning and operation / Nor Laili Ismail by Ismail, Nor Laili

    Published 2024
    “…Subsequently, the proposed HEBMO was integrated with an artificial neural network (ANN) for the scheduling of input features of the generator to predict total fuel cost and emission in power system planning. …”
    Get full text
    Get full text
    Thesis
  9. 9
  10. 10

    Selecting quality initial random seed for metaheuristic pproaches: a case of timetabling problem by Md Sultan, Abu Bakar, Mahmod, Ramlan, Sulaiman, Md. Nasir, Abu Bakar, Mohd Rizam

    Published 2008
    “…The University Course Timetabling Problems (UCTP) deals with the scheduling of the teaching program. Metaheuristic techniques have been very successful in a wide range of timetabling problem including UCTP. …”
    Get full text
    Get full text
    Get full text
    Article