Search Results - (( java implementation path algorithm ) OR ( programming planning application algorithm ))

Refine Results
  1. 1

    Heavy Transportation Shortest Route using Dijkstra’s algorithm (HETRO) / Nurul Aqilah Ahmad Nezer by Ahmad Nezer, Nurul Aqilah

    Published 2017
    “…The development tools used in developing this project is NetBeans by using Java for the implementation of the coding. The methodology that used for developing this system is the Dijkstra’s algorithm. …”
    Get full text
    Get full text
    Thesis
  2. 2

    Embedded system for indoor guidance parking with Dijkstra’s algorithm and ant colony optimization by Mohammad Ata, Karimeh Ibrahim

    Published 2019
    “…BST inserts the nodes in the way that the Dijkstra’s can find the empty parking in fastest way. Dijkstra’s algorithm initials the paths to finding the shortest path while ACO optimizes the paths. …”
    Get full text
    Get full text
    Thesis
  3. 3

    Path planning for unmanned aerial vehicle (UAV) using rotated accelerated method in static outdoor environment by Shaliza Hayati A. Wahab, Nordin Saad, Azali Saudi, Ali Chekima

    Published 2021
    “…In this study, a fast iterative method known as Rotated Successive Over-Relaxation (RSOR) is introduced. The algorithm is implemented in a self-developed 2D Java tool, UAV Planner. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  4. 4

    Smart appointment organizer for mobile application / Mohd Syafiq Adam by Adam, Mohd Syafiq

    Published 2009
    “…The main component of this prototype is the use of Dijkstra algorithm to compute the shortest path from source of appointment to the 6 points of destinations within UiTM Shah Alam. …”
    Get full text
    Get full text
    Thesis
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10

    Vision-based robot indoor navigation by Teo, Zhin Hang

    Published 2022
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18

    Development of a Production Planning and Control Software in Total Productivity Maintenance Environment by Lee, Pang Seng

    Published 2004
    “…A TPM based software program has been developed to ease the process of production planning and control in TPM environment by executing sequential methodology such as problem identification, literature review, problem formulation, data coliection, company operation review, flow chart system and program algorithm before test run in the company. …”
    Get full text
    Get full text
    Thesis
  19. 19
  20. 20