Search Results - (( java implementation path algorithm ) OR ( program objective scheduling algorithm ))

Refine Results
  1. 1

    Development of dynamic programming algorithm for maintenance scheduling problem by Zafira Adlia, Mohd Fauzi

    Published 2020
    “…The objectives of this research are to develop a dynamic programming algorithm for the maintenance scheduling problem that can deal with the uncertainty and to determine the optimum maintenance schedule that will change according to the uncertainty that happened. …”
    Get full text
    Get full text
    Thesis
  2. 2

    Heavy Transportation Shortest Route using Dijkstra’s algorithm (HETRO) / Nurul Aqilah Ahmad Nezer by Ahmad Nezer, Nurul Aqilah

    Published 2017
    “…The development tools used in developing this project is NetBeans by using Java for the implementation of the coding. The methodology that used for developing this system is the Dijkstra’s algorithm. …”
    Get full text
    Get full text
    Thesis
  3. 3

    Hybrid scheduling and dual queue scheduling by Mahmood, Ahmad Kamil

    Published 2009
    “…Our research work involves the design and development of new CPU scheduling algorithms (the Hybrid Scheduling Algorithm and the Dual Queue Scheduling Algorithm) with a view to optimization. …”
    Get full text
    Get full text
    Conference or Workshop Item
  4. 4

    Embedded system for indoor guidance parking with Dijkstra’s algorithm and ant colony optimization by Mohammad Ata, Karimeh Ibrahim

    Published 2019
    “…BST inserts the nodes in the way that the Dijkstra’s can find the empty parking in fastest way. Dijkstra’s algorithm initials the paths to finding the shortest path while ACO optimizes the paths. …”
    Get full text
    Get full text
    Thesis
  5. 5

    Path planning for unmanned aerial vehicle (UAV) using rotated accelerated method in static outdoor environment by Shaliza Hayati A. Wahab, Nordin Saad, Azali Saudi, Ali Chekima

    Published 2021
    “…In this study, a fast iterative method known as Rotated Successive Over-Relaxation (RSOR) is introduced. The algorithm is implemented in a self-developed 2D Java tool, UAV Planner. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  6. 6
  7. 7

    Hybrid scheduling and dual queue scheduling by A., Oxley, S.N.M., Shah, A.K., Mahmood

    Published 2009
    “…Our research work involves the design and development of new CPU scheduling algorithms (the Hybrid Scheduling Algorithm and the Dual Queue Scheduling Algorithm) with a view to optimization. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  8. 8
  9. 9
  10. 10

    Optimising police officer schedule at Ibu Pejabat Polis Daerah (IPD) Kuala Muda using goal programming / Nurul Atikah Abdull by Abdull, Nurul Atikah

    Published 2021
    “…The objective of this study is to obtain the best and most systematic schedules for police officers while considering all the constraints using goal programming method. …”
    Get full text
    Get full text
    Student Project
  11. 11

    Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches by Mohd Pauzi, Nur Fazlinda

    Published 2015
    “…The main objective of this research is to develop a computer program with capability of manipulating the onlooker bee approaches in ABC Algorithm for solving flowshop scheduling problem. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  12. 12

    Smart appointment organizer for mobile application / Mohd Syafiq Adam by Adam, Mohd Syafiq

    Published 2009
    “…The main component of this prototype is the use of Dijkstra algorithm to compute the shortest path from source of appointment to the 6 points of destinations within UiTM Shah Alam. …”
    Get full text
    Get full text
    Thesis
  13. 13
  14. 14

    Sequential and parallel multiple tabu search algorithm for multiobjective urban transit scheduling problems by Uvaraja, Vikneswary

    Published 2018
    “…A mixed integer programming models are formulated to represent the objectives. …”
    Get full text
    Get full text
    Thesis
  15. 15
  16. 16
  17. 17

    SG-PBFS : Shortest Gap-Priority Based Fair Scheduling technique for job scheduling in cloud environment by Murad, Saydul Akbar, Zafril Rizal, M. Azmi, Muzahid, Abu Jafar Md, Bhuiyan, Md Khairul Bashar, Saib, Md, Rahimi, Nick, Prottasha, Nusrat Jahan, Bairagi, Anupam Kumar

    Published 2024
    “…To address this issue, the main objective of this research is to improve the existing Priority Rules (PR) cloud schedulers by developing a new dynamic scheduling algorithm by manipulating the gaps in the cloud job schedule. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  18. 18

    Local search approaches for patient scheduling problem in parallel operating theatre by Alimin, Nur Neesha

    Published 2020
    “…Scheduling for patients in parallel OT can help to schedule a large number of patients and emergency patients are considered in this study .Other than that, emergency patients are able to be scheduled and treated on the day as the modification of schedule is performed during the dynamic processof scheduling. …”
    Get full text
    Get full text
    Thesis
  19. 19
  20. 20

    An improved design for cellular manufacturing system associating scheduling decisions by Subhaa, R., Jawahar, N., Ponnambalam, S. G.

    Published 2019
    “…A non-linear integer mathematical programming model is formulated with the objective function of minimizing operating cost which is the sum of Machine Utility Cost (MUC) and inter-cell costs. …”
    Get full text
    Get full text
    Get full text
    Article