Search Results - (( java implementation modified algorithm ) OR ( program transition based algorithm ))
Search alternatives:
- implementation modified »
- java implementation »
- transition based »
-
1
Direct approach for mining association rules from structured XML data
Published 2012“…The thesis also provides a two different implementation of the modified FLEX algorithm using a java based parsers and XQuery implementation. …”
Get full text
Get full text
Thesis -
2
OPTIMIZED MIN-MIN TASK SCHEDULING ALGORITHM FOR SCIENTIFIC WORKFLOWS IN A CLOUD ENVIRONMENT
Published 2023“…To achieve this, we propose a new noble mechanism called Optimized Min-Min (OMin-Min) algorithm, inspired by the Min-Min algorithm. The objectives of this work are: i) to provide a comprehensive review of the cloud and scheduling process; ii) to classify the scheduling strategies and scientific workflows; iii) to implement our proposed algorithm with various scheduling algorithms (i.e., Min-Min, Round-Robin, Max-Min, and Modified Max-Min) for performance comparison, within different cloudlet sizes (i.e., small, medium, large, and heavy) in three scientific workflows (i.e., Montage, Epigenomics, and SIPHT); and iv) to investigate the performance of the implemented algorithms by using CloudSim. …”
Review -
3
Prevention And Detection Mechanism For Security In Passive Rfid System
Published 2013“…The proposed protocol is designed with lightweight cryptographic algorithm, including XOR, Hamming distance, rotation and a modified linear congruential generator (MLCG). …”
Get full text
Get full text
Thesis -
4
Automatic generation of content security policy to mitigate cross site scripting
Published 2016“…It can be extended to support generating CSP for contents that are modified by JavaScript after loading. Current approach inspects the static contents of URLs.…”
Get full text
Get full text
Conference or Workshop Item -
5
Sequential and parallel multiple tabu search algorithm for multiobjective urban transit scheduling problems
Published 2018“…Urban Transit Scheduling Problem (UTSP) considers the process of creating timely transit schedules that includes bus and drivers assignment based on the users' and operators’ requirements. …”
Get full text
Get full text
Thesis -
6
Sub-route reversal repair mechanism and differential evolution for urban transit network design problem
Published 2017“…From the literature of UTNDP, the most widely used metaheuristic is the genetic algorithm, at the expense of other population-based metaheuristics. …”
Get full text
Get full text
Thesis -
7
Object-Oriented Programming semantics representation utilizing agents
Published 2011“…The problem occurs during the transition from learning fundamental programming language concept to OOP concept. …”
Get full text
Get full text
Get full text
Article -
8
Estimation of Transformers Health Index Based on Condition Parameter Factor and Hidden Markov Model
Published 2023Conference Paper -
9
Fault detection with optimum March Test Algorithm
Published 2012“…Therefore to improve fault detection, an automation program is developed based on sequence operation (SQ) generation rules. …”
Get full text
Conference or Workshop Item -
10
Adaptive persistence layer for synchronous replication (PLSR) in heterogeneous system
Published 2011“…The PLSR architecture model, workflow and algorithms are described. The PLSR has been developed using Java Programming language. …”
Get full text
Get full text
Thesis -
11
-
12
Switching Time Optimization via Time Optimal Control for Natural Gas Vehicle Refueling
Published 2007“…These become the performance measurements used to evaluate the performance of TOC and other NGV controller currently applied in the commercial NGV dispenser i. e., Kraus refueling algorithm. The performance of the refueling algorithms are evaluated based on three experiments: the first experiment is the performance of valves switching and refueling time transitions; the second experiment is the performance of refueling when the storage pressures are set to 3600 psig while the receiver tank is varied from 20 to 2000 psig; and the third experiment is the performance of refueling when the storage pressures are set to different pressures while the receiver tank is maintained at 20 psig. …”
Get full text
Get full text
Thesis -
13
Smart biosecurity door locking system / Nur Nadia Syahirah ‘Asri
Published 2017“…Furthermore, the system was developed using Fingerprint Matching Algorithm (FMA), Image Processing technique and embedded programming technique. …”
Get full text
Get full text
Thesis -
14
Challenges of hidden data in the unused area two within executable files
Published 2009“…Results: The programs were coded in Java computer language and implemented on Pentium PC. …”
Get full text
Get full text
Get full text
Article -
15
A Framework for Green Energy Resources Identification and Integration Supported by Real-Time Monitoring, Control, and Automation Applications
Published 2025“…Following site identification, an improved Geographical Information System-driven fuzzy Traveling Salesman Problem-Binary Integer Programming algorithm was proposed to integrate these sites into a reliable ring-based system topology, aiming to achieve a zero-carbon footprint. …”
Get full text
Get full text
Get full text
Get full text
Thesis -
16
Multiple and solid data background scheme for testing static single cell faults on SRAM memories
Published 2013“…Therefore, the purpose of this thesis is to introduce a Data Background (DB) scheme to generate an optimal March Test Algorithm (MTA) for detecting faults of memory that are undetectable using existing algorithms. …”
Get full text
Get full text
Thesis -
17
-
18
Development of intelligent telegram Chatbot using natural language processing
Published 2021Get full text
Get full text
Get full text
Get full text
Get full text
Proceeding Paper -
19
Fuzzy-based multi-agent approach for reliability assessment and improvement of power system protection
Published 2015“…Meanwhile, the second MAS model has been designed using two agents as follows: the first agent is a fault current agent that is to determine the fault current at all points before and after grounding; the second agent is the time operating of the agent which is used to determine the relay operating time before and after modifying fault current. The simulation results for the first and second models are done using the data obtained from Malaysia distribution network (DISCO-Net) and 69 bus test system that were implemented using Java Agent Development Framework package software. …”
Get full text
Get full text
Thesis -
20
