Search Results - (( java implementation modified algorithm ) OR ( building program path algorithm ))

  • Showing 1 - 19 results of 19
Refine Results
  1. 1

    Path planning algorithm for a car like robot based on MILP method by Mohd Sadri, Mohd Pawzi

    Published 2013
    “…The final phases are the design and build coalitions of linear programs and binary constraints to avoid collision with obstacles by Integer Mixed Linear Program (MILP). …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  2. 2

    Direct approach for mining association rules from structured XML data by Abazeed, Ashraf Riad

    Published 2012
    “…The thesis also provides a two different implementation of the modified FLEX algorithm using a java based parsers and XQuery implementation. …”
    Get full text
    Get full text
    Thesis
  3. 3

    MAZE ROBOT: APPLYING AUTONOMOUS VEHICLE NAVIGATION ALGORITHM WITH EVENT-DRIVEN PROGRAMMING by ABDUL MALEK, NADHIRA

    Published 2011
    “…Event-driven programming method was applied in producing the maze navigation algorithm for the robot.…”
    Get full text
    Get full text
    Final Year Project
  4. 4

    OPTIMIZED MIN-MIN TASK SCHEDULING ALGORITHM FOR SCIENTIFIC WORKFLOWS IN A CLOUD ENVIRONMENT by Murad S.S., Badeel R., Alsandi N.S.A., Alshaaya R.F., Ahmed R.A., Muhammed A., Derahman M.

    Published 2023
    “…To achieve this, we propose a new noble mechanism called Optimized Min-Min (OMin-Min) algorithm, inspired by the Min-Min algorithm. The objectives of this work are: i) to provide a comprehensive review of the cloud and scheduling process; ii) to classify the scheduling strategies and scientific workflows; iii) to implement our proposed algorithm with various scheduling algorithms (i.e., Min-Min, Round-Robin, Max-Min, and Modified Max-Min) for performance comparison, within different cloudlet sizes (i.e., small, medium, large, and heavy) in three scientific workflows (i.e., Montage, Epigenomics, and SIPHT); and iv) to investigate the performance of the implemented algorithms by using CloudSim. …”
    Review
  5. 5

    Prevention And Detection Mechanism For Security In Passive Rfid System by Khor, Jing Huey

    Published 2013
    “…The proposed protocol is designed with lightweight cryptographic algorithm, including XOR, Hamming distance, rotation and a modified linear congruential generator (MLCG). …”
    Get full text
    Get full text
    Thesis
  6. 6

    Automatic generation of content security policy to mitigate cross site scripting by Mhana, Samer Attallah, Din, Jamilah, Atan, Rodziah

    Published 2016
    “…It can be extended to support generating CSP for contents that are modified by JavaScript after loading. Current approach inspects the static contents of URLs.…”
    Get full text
    Get full text
    Conference or Workshop Item
  7. 7
  8. 8
  9. 9

    Integration of program evaluation and review technique (PERT), gantt chart and genetic algorithm in project management scheduling by Ahmad, Siti Hasziani

    Published 2014
    “…In this thesis, the discussion on the integration approach, which combines Program Evaluation and Review Technique (PERT), Gantt Chart (GC) and Genetic Algorithm (GA), is carried out. …”
    Get full text
    Get full text
    Get full text
    Thesis
  10. 10

    Multi-sensor fusion for automated guided vehicle positioning by Ahmed Elshayeb, Said Abdo

    Published 2010
    “…Radio frequency module is used to transfer sensors reading from the mobile robot to a host PC has software program written on LabVIEW, which has a positioning algorithm and graphical display for robot position. …”
    Get full text
    Get full text
    Get full text
    Thesis
  11. 11

    Soft computing approach for solving elevator scheduling problem by Norzatul Hajar, Abd Majid

    Published 2010
    “…Elevator scheduling problem involves finding an optimal path of certain number of elevators movement in a building with certain number of floors. …”
    Get full text
    Get full text
    Get full text
    Final Year Project Report / IMRAD
  12. 12

    Adaptive persistence layer for synchronous replication (PLSR) in heterogeneous system by Beg, Abul Hashem

    Published 2011
    “…The PLSR architecture model, workflow and algorithms are described. The PLSR has been developed using Java Programming language. …”
    Get full text
    Get full text
    Thesis
  13. 13

    Automatic extraction of digital terrain model and Building Footprint from airborne LiDAR data using rule-based learning techniques by Jifroudi, Hamidreza Maskani

    Published 2021
    “…Finally, the Buildings Footprint developed based on the algorithm was compared with the Buildings Footprint developed manually to assess the accuracy of the results. …”
    Get full text
    Get full text
    Get full text
    Thesis
  14. 14

    Restoration planning strategy of transmission system based on optimal energizing time of sectionalizing islands / Dian Najihah Abu Talib by Dian Najihah , Abu Talib

    Published 2019
    “…There are two discrete optimization techniques used in this work, which are the Artificial Bee Colony algorithm and Evolutionary Programming. Modification and simplification using parallel processing are done for both methods to grossly search the optimal solution and to minimize the program running time, respectively. …”
    Get full text
    Get full text
    Get full text
    Thesis
  15. 15

    Challenges of hidden data in the unused area two within executable files by Naji, Ahmed Wathik, Zaidan, A.A., Zaidan, B.B.

    Published 2009
    “…Results: The programs were coded in Java computer language and implemented on Pentium PC. …”
    Get full text
    Get full text
    Get full text
    Article
  16. 16

    Fuzzy-based multi-agent approach for reliability assessment and improvement of power system protection by Nadheer Abdulridha, Shalash

    Published 2015
    “…Meanwhile, the second MAS model has been designed using two agents as follows: the first agent is a fault current agent that is to determine the fault current at all points before and after grounding; the second agent is the time operating of the agent which is used to determine the relay operating time before and after modifying fault current. The simulation results for the first and second models are done using the data obtained from Malaysia distribution network (DISCO-Net) and 69 bus test system that were implemented using Java Agent Development Framework package software. …”
    Get full text
    Get full text
    Thesis
  17. 17

    Evolutionary cost-cognizant regression test case prioritization for object-oriented programs by Bello, AbdulKarim

    Published 2019
    “…There is also a need to consider implementing this strategy for dynamic object-oriented languages such as Python, Lisp, and Smalltalk.…”
    Get full text
    Get full text
    Thesis
  18. 18

    Bayesian network of influence of sociodemographic variables on dengue related knowledge, attitude, and practices in selected areas in Selangor, Malaysia by Ajibola, Lamidi-Sarumoh Alaba

    Published 2019
    “…The main objective of this research is the novel application of Partial least square path analysis (PLS-PA) to explore the latent sub-constructs of knowledge, attitude, and practices (KAP) on dengue via R programming language. …”
    Get full text
    Get full text
    Thesis
  19. 19