Search Results - (( java implementation 5s algorithm ) OR ( program making problem algorithm ))

Refine Results
  1. 1

    Optimal route checking using genetic algorithm for UiTM's bus services / Tengku Salman Fathi Tengku Jaafar by Tengku Jaafar, Tengku Salman Fathi

    Published 2006
    “…This research study with the development of the Optimal Route Checking Using Genetic Algorithm system should solve this scenario. By taking the bus services in Universiti Teknologi MARA as sample, the research has used the genetic algorithm approach to solve the problem which is similar to the Travel Salesman Problem. …”
    Get full text
    Get full text
    Thesis
  2. 2
  3. 3

    Metaheuristic Algorithms Based on Compromise Programming for the Multi-Objective Urban Shipment Problem by Ngo, T.S., Jaafar, J., Aziz, I.A., Aftab, M.U., Nguyen, H.G., Bui, N.A.

    Published 2022
    “…We designed a hybrid version of the genetic algorithm with the local search algorithm to solve the proposed problem. …”
    Get full text
    Get full text
    Article
  4. 4

    Some metaheuristic algorithms for solving multiple cross-functional team selection problems by Ngo, S.T., Jaafar, J., Izzatdin, A.A., Tong, G.T., Bui, A.N.

    Published 2022
    “…We introduced a method that combines a compromise programming (CP) approach and metaheuristic algorithms, including the genetic algorithm (GA) and ant colony optimization (ACO), to solve the proposed optimization problem. …”
    Get full text
    Get full text
    Article
  5. 5

    Optimize class time tabling by using genetic algorithm technique in UTHM by Ahmad, Izah Rafidah

    Published 2019
    “…A new algorithm was produced to handle the timetabling problem in the university. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  6. 6
  7. 7
  8. 8

    A genetic algorithm for capital budgeting problem with fuzzy parameters by Rashidi-Bajgan, Hannaneh, Rezaeian, Javad, Nehzati, Taravatsadat, Ismail, Napsiah

    Published 2010
    “…Capital Budgeting (CB) problem is one of the most important issues in decision makings about capital in the manufacturing management. …”
    Get full text
    Get full text
    Conference or Workshop Item
  9. 9

    Development of dynamic programming algorithm for maintenance scheduling problem by Zafira Adlia, Mohd Fauzi

    Published 2020
    “…The objectives of this research are to develop a dynamic programming algorithm for the maintenance scheduling problem that can deal with the uncertainty and to determine the optimum maintenance schedule that will change according to the uncertainty that happened. …”
    Get full text
    Get full text
    Thesis
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15

    Modeling a problem solving approach through computational thinking for teaching programming / Zebel Al Tareq by Zebel , Al Tareq

    Published 2021
    “…An experimental study was designed to evaluate the PSA model. The syntax-based programming workshop was the control group. The problem-based and the game-based programming workshops utilizing our problem-solving model using sorting algorithms were the experimental groups. …”
    Get full text
    Get full text
    Get full text
    Thesis
  16. 16

    Optimizing the placement of fire department in Kulim using greedy heuristic and simplex method / Muhammad Abu Syah Mohd Suzaly by Mohd Suzaly, Muhammad Abu Syah

    Published 2023
    “…The binary integer programming (BIP) issue is a rare form of integer programming problem in which the value of variable xi is only 0 or 1. …”
    Get full text
    Get full text
    Thesis
  17. 17
  18. 18

    Simulation of shortest path using a-star algorithm / Nurul Hani Nortaja by Nurul Hani , Nortaja

    Published 2004
    “…As for WXES3l82, the thesis cover the development of programming code, the code implementation and testing and the evaluation including discussion about the problem/constraints meed in the coding program development. …”
    Get full text
    Get full text
    Thesis
  19. 19
  20. 20