Search Results - (( java application system algorithm ) OR ( program application scheduling algorithm ))

Refine Results
  1. 1

    Attribute reduction based scheduling algorithm with enhanced hybrid genetic algorithm and particle swarm optimization for optimal device selection by Nwogbaga, Nweso Emmanuel, Latip, Rohaya, Affendey, Lilly Suriani, Abdul Rahiman, Amir Rizaan

    Published 2022
    “…Therefore, in this paper, we proposed Dynamic tasks scheduling algorithm based on attribute reduction with an enhanced hybrid Genetic Algorithm and Particle Swarm Optimization for optimal device selection. …”
    Get full text
    Get full text
    Article
  2. 2
  3. 3
  4. 4
  5. 5

    Volunteer Management System by Muhammad Fazril Bin Mohd Amin, Muhammad Fazril

    Published 2012
    “…The project will adopt the Iterative and incremental development methodology, which promotes constant reevaluation, and will be built on the java programming language and developed on the Netbeans IDE, for the GUI and algorithm implementation. …”
    Get full text
    Get full text
    Final Year Project
  6. 6

    Graph coloring program of exam scheduling modeling based on bitwise coloring algorithm using python by Arifin, Samsul, Muktyas, Indra Bayu, Al Maki, Wikky Fawwaz, Mohd Khairul Bazli, Mohd Aziz

    Published 2022
    “…In this article, the researchers design an algorithm and apply it to a computer program (Python) to solve graph coloring and to visualize the variation of exam scheduling modeling at Binus University in graphs based on the Bitwise Graph Coloring Algorithm. …”
    Get full text
    Get full text
    Get full text
    Article
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17

    Integration of program evaluation and review technique (PERT), gantt chart and genetic algorithm in project management scheduling by Ahmad, Siti Hasziani

    Published 2014
    “…The aims are (1) to review the existing scheduling techniques, (2) to propose an integrated approach for solving the scheduling problem in the construction industry, and (3) to compare the applicable of the approach proposed with the existing techniques. …”
    Get full text
    Get full text
    Get full text
    Thesis
  18. 18
  19. 19
  20. 20