Search Results - (( java application mining algorithm ) OR ( program application cell algorithm ))

Refine Results
  1. 1
  2. 2
  3. 3

    Study and Implementation of Data Mining in Urban Gardening by Mohana, Muniandy, Lee, Eu Vern

    Published 2019
    “…Attached sensors generate data and send these data to the Java Servlet application through a WIFI module. These data are processed and stored in appropriate formats in a MySQL server database. …”
    Get full text
    Get full text
    Get full text
    Article
  4. 4

    Mining Sequential Patterns Using I-PrefixSpan by Dhany , Saputra, Rambli Dayang, R.A., Foong, Oi Mean

    Published 2007
    “…Sequential pattern mining is a relatively new data-mining problem with many areas of application. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item
  5. 5

    A web-based implementation of k-means algorithms by Lee, Quan

    Published 2022
    “…This stinginess of proximity measures in data mining tools is stifling the performance of the algorithm. …”
    Get full text
    Get full text
    Final Year Project / Dissertation / Thesis
  6. 6
  7. 7

    Features selection for intrusion detection system using hybridize PSO-SVM by Tabaan, Alaa Abdulrahman

    Published 2016
    “…The simulation will be carried on WEKA tool, which allows us to call some data mining methods under JAVA environment. The proposed model will be tested and evaluated on both NSL-KDD and KDD-CUP 99 using several performance metrics.…”
    Get full text
    Get full text
    Thesis
  8. 8
  9. 9
  10. 10
  11. 11

    Optimizing tree planting areas through integer programming and improved genetic algorithm by Md Badarudin, Ismadi

    Published 2012
    “…Therefore, a hybrid algorithm through an incorporation of Integer Programming and Improved Genetic Algorithm was proposed for planting lining design. …”
    Get full text
    Get full text
    Thesis
  12. 12

    Solar panel tracker model using PIC16F877A by Noor Kamal, Noralif Khairrurijaal

    Published 2005
    “…Moreover, the Liquid Crystal Display (LCD) cannot display the value of output voltage from solar cell. It only manages to display "voltage" preset by program. …”
    Get full text
    Get full text
    Student Project
  13. 13
  14. 14

    Integrated pyranometer for photovoltaic module measurement by Abdul Aziz, Mohamad Faiz Syazwan

    Published 2013
    “…All measurements from the pyranometer and temperature modules were controlled by a Microprocessor PIC16F877A which provides programming strategy through basic C language. The algorithm was designed based on the calibrated solar cell and the temperature sensor modules and the measured values were displayed on an LCD display. …”
    Get full text
    Get full text
    Student Project
  15. 15

    Integrated pyranometer for photovoltaic module measurement: article by Abdul Aziz, Mohamad Faiz Syazwan

    Published 2013
    “…All measurements from the pyranometer and temperature modules were controlled by a Microprocessor PIC16F877A which provides programming strategy through basic C language. The algorithm was designed based on the calibrated solar cell and the temperature sensor modules and the measured values were displayed on an LCD display. …”
    Get full text
    Get full text
    Article
  16. 16
  17. 17
  18. 18

    Development of an integrated model for production planning and cell formation in cellular manufacturing systems by Raminfar, Reza

    Published 2010
    “…However, only a few studies explicitly and simultaneously incorporate the CMS context, production planning and cell formation problem. In this thesis, a mathematical programming model is developed using an integrated approach for production planning and CF problems in a CMS. …”
    Get full text
    Get full text
    Thesis
  19. 19
  20. 20

    Design of power device sizing and integration for solar-powered aircraft application by Danjuma, Safyanu Bashir, Omar, Zamri, Abdullah, Mohd Noor

    Published 2021
    “…The input variables were incorporated into the MS Excel program to determine the output variables. The output variables are; the power required 10.92 W, the total electrical power 19.47 W, the total electrical energy 465.5 Wh, the daily solar energy 578.33 Wh, the solar cell area 0.62 m, the number of PV cell 32, and the number of the Rechargeable battery 74 respectively. …”
    Get full text
    Get full text
    Article