Search Results - (( intelligence task scheduling algorithm ) OR ( intelligence based can algorithm ))
Search alternatives:
- intelligence based »
- intelligence task »
- can algorithm »
- based can »
-
1
Hybrid ant colony system algorithm for static and dynamic job scheduling in grid computing
Published 2015“…One of the prominent intelligent algorithms is ant colony system (ACS) which is implemented widely to solve various types of scheduling problems. …”
Get full text
Get full text
Get full text
Thesis -
2
-
3
Processing time estimation in precision machining industry using AI / Lim Say Li
Published 2017“…Neural Network (NN) model is chosen as the artificial intelligence approach used in this research. Levenberg-Marquardt algorithm is used as the training algorithm. …”
Get full text
Get full text
Thesis -
4
Process Planning Optimization In Reconfigurable Manufacturing Systems
Published 2008“…On the other hand, the superior performance of the genetic algorithm that implements an extended diversity control mechanism demonstrates that more competent genetic algorithms can be designed through customized operators. …”
Get full text
Get full text
Thesis -
5
Distance vector-hop range-free location algorithm for wireless sensor network
Published 2015“…Thus, this research has proposed two ideas. First is the intelligent nodes placement algorithm for sensor nodes in order to introduce algorithm with low complexity and low localization error. …”
Get full text
Get full text
Thesis -
6
Multi agent quality of service routing based on scheme ant colony optimization algorithm
Published 2014“…The important new aspect of ACR-QoS is the combination of constraint-based routing and DiffServ architecture, in Swarm Intelligence (SI) structure where a set of artificial ants is used to determine the optimal path for each class to construct class-based routing tables. …”
Get full text
Get full text
Thesis -
7
An Effective Power Dispatch Strategy for Clustered Micro-grids while Implementing Optimal Energy Management and Power Sharing Control using Power Line Communication
Published 2019“…Frequency shift keying (FSK) technique has been adopted for transmitting the binary signal over the power line communication (PLC). A part of the algorithm is utilized to deal with the optimal scheduling control while the other actuates the dynamic demand response based Photovoltaic (PV) power forecasting. …”
Get full text
Get full text
Get full text
Proceeding -
8
-
9
An Effective Power Dispatch Strategy for Clustered Microgrids While Implementing Optimal Energy Management and Power Sharing Control Using Power Line Communication
Published 2020“…A part of the algorithm is utilized to deal withthe optimal scheduling control, whereas the other actuates thedynamic-demand-response-based photovoltaic power forecasting.The performance of the proposed approach with the formulatedbackup injection index has been validated using data collectedfrom the practical network of “Bario, Sarawak.” …”
Get full text
Get full text
Get full text
Article -
10
-
11
Evaluate the performance of university timetabling problem with various artificial intelligence techniques
Published 2025Get full text
Get full text
Final Year Project / Dissertation / Thesis -
12
Energy Management Strategies for Optimal Hybrid Microgrid Configuration in the Smart Village Context
Published 2018“…A part of the developed algorithm is used to deal with the optimal scheduling control while the other actuates the dynamic demand response based PV power forecasting. …”
Get full text
Get full text
Get full text
Thesis -
13
-
14
Task scheduling in cloud computing using Harris-Hawk Optimization
Published 2024Get full text
Get full text
Get full text
Proceedings -
15
Semantic-Based, Scalable, Decentralized and Dynamic Resource Discovery for Internet-Based Distributed System
Published 2010“…This is very important, as resource reservation and task scheduling are based on it. Unfortunately, RD in grid is very challenging as resources and users are distributed, resources are heterogeneous in their platforms, status of the resources is dynamic (resources can join or leave the system without any prior notice) and most recently the introduction of a new type of grid called intergrid (grid of grids) with the use of multi middlewares. …”
Get full text
Get full text
Thesis -
16
Semantic-Based, Scalable, Decentralized and Dynamic Resource Discovery for Internet-Based Distributed System
Published 2010“…This is very important, as resource reservation and task scheduling are based on it. Unfortunately, RD in grid is very challenging as resources and users are distributed, resources are heterogeneous in their platforms, status of the resources is dynamic (resources can join or leave the system without any prior notice) and most recently the introduction of a new type of grid called intergrid (grid of grids) with the use of multi middlewares. …”
Get full text
Get full text
Thesis -
17
Managing risk in production scheduling under uncertain disruption
Published 2015Get full text
Get full text
Get full text
Article -
18
Development of optimized maintenance scheduling model for coal-fired power plant boiler
Published 2023“…Computing intelligence is a soft-computing subset of artificial intelligence referring to the potential of a computer to gain knowledge from an experimental observations or specific task. …”
text::Thesis -
19
Intelligent dashboard with speech enhancement
Published 1997“…Numerous asynchronous scheduling tasks necessitate the architecture to be re-configurable. …”
Get full text
Get full text
Get full text
Proceeding Paper -
20
A New Grid Resource Discovery Framework
“…Resource discovery (RD) is an important key issue in grid systems since resource reservation and task scheduling are based on it. This paper proposes a novel semantic-based scalable decentralized grid RD framework. …”
Get full text
Get full text
Conference or Workshop Item
