Search Results - (( intelligence system new algorithm ) OR ( intelligence task scheduling algorithm ))

Refine Results
  1. 1
  2. 2

    A New Grid Resource Discovery Framework by Mahamat Issa, Hassan, Azween , Abdullah

    “…Resource discovery (RD) is an important key issue in grid systems since resource reservation and task scheduling are based on it. This paper proposes a novel semantic-based scalable decentralized grid RD framework. …”
    Get full text
    Get full text
    Conference or Workshop Item
  3. 3

    A New Grid Resource Discovery Framework by Hassan, Mahamat I., Azween, Abdullah

    Published 2011
    “…Resource discovery (RD) is an important key issue in grid systems since resource reservation and task scheduling are based on it. This paper proposes a novel semantic-based scalable decentralized grid RD framework. …”
    Get full text
    Get full text
    Get full text
    Citation Index Journal
  4. 4

    A New Grid Resource Discovery Framework by Mahamat Issa, Hassan, Azween, Abdullah

    Published 2009
    “…Resource discovery (RD) is an important key issue in grid systems since resource reservation and task scheduling are based on it. This paper proposes a novel semantic-based scalable decentralized grid RD framework. …”
    Get full text
    Get full text
    Citation Index Journal
  5. 5

    Process Planning Optimization In Reconfigurable Manufacturing Systems by Musharavati, Farayi

    Published 2008
    “…The five (5) AADTs include; a variant of the simulated annealing algorithm that implements heuristic knowledge at critical decision points, two (2) cooperative search schemes based on a “loose hybridization” of the Boltzmann Machine algorithm with (i) simulated annealing, and (ii) genetic algorithm search techniques, and two (2) modified genetic algorithms. …”
    Get full text
    Get full text
    Thesis
  6. 6

    Semantic-Based Scalable Decentralized Resource Discovery by Mahamat Issa , Hassan, Azween, Abdullah

    Published 2010
    “…Resource Discovery (RD) is a key issue in Grid systems since resource reservation and task scheduling are based on it. …”
    Get full text
    Get full text
    Conference or Workshop Item
  7. 7
  8. 8

    Semantic-Based Scalable Decentralized Grid Resource Discovery by Mahamat Issa , Hassan, Azween, Abdullah

    Published 2009
    “…Resource Discovery (RD) is a key issue in Grid systems since resource reservation and task scheduling are based on it. …”
    Get full text
    Get full text
    Conference or Workshop Item
  9. 9

    Hybrid ant colony system algorithm for static and dynamic job scheduling in grid computing by Alobaedy, Mustafa Muwafak Theab

    Published 2015
    “…The main part of RMS is the scheduler algorithm which has the responsibility to map submitted tasks to available resources. …”
    Get full text
    Get full text
    Get full text
    Thesis
  10. 10
  11. 11

    Semantic-Based, Scalable, Decentralized and Dynamic Resource Discovery for Internet-Based Distributed System by Hassan, Mahamat. I, Azween, Abdullah

    Published 2010
    “…This is very important, as resource reservation and task scheduling are based on it. Unfortunately, RD in grid is very challenging as resources and users are distributed, resources are heterogeneous in their platforms, status of the resources is dynamic (resources can join or leave the system without any prior notice) and most recently the introduction of a new type of grid called intergrid (grid of grids) with the use of multi middlewares. …”
    Get full text
    Get full text
    Thesis
  12. 12

    Semantic-Based, Scalable, Decentralized and Dynamic Resource Discovery for Internet-Based Distributed System by HASSAN, MAHAMAT ISSA

    Published 2010
    “…This is very important, as resource reservation and task scheduling are based on it. Unfortunately, RD in grid is very challenging as resources and users are distributed, resources are heterogeneous in their platforms, status of the resources is dynamic (resources can join or leave the system without any prior notice) and most recently the introduction of a new type of grid called intergrid (grid of grids) with the use of multi middlewares. …”
    Get full text
    Get full text
    Thesis
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17

    Development of optimized maintenance scheduling model for coal-fired power plant boiler by Noor Fazreen Binti Ahmad Fuzi, Ms.

    Published 2023
    “…Computing intelligence is a soft-computing subset of artificial intelligence referring to the potential of a computer to gain knowledge from an experimental observations or specific task. …”
    text::Thesis
  18. 18

    Intelligent dashboard with speech enhancement by Abdul Rahman, Abdul Wahab, Tan, Eng Chong, Abut, Huseyin

    Published 1997
    “…Numerous asynchronous scheduling tasks necessitate the architecture to be re-configurable. …”
    Get full text
    Get full text
    Get full text
    Proceeding Paper
  19. 19

    Intelligent energy systems using the barnacles mating optimizer and evolutionary mating algorithm: Foundations, methods, and applications by Mohd Herwan, Sulaiman, Zuriani, Mustaffa

    Published 2026
    “…Intelligent Energy Systems using the Barnacles Mating Optimizer and Evolutionary Mating Algorithm: Foundations, Methods, and Applications reveals the potential of innovative optimization algorithms to support sustainability in modern energy systems. …”
    Get full text
    Get full text
    Get full text
    Book
  20. 20

    Processing time estimation in precision machining industry using AI / Lim Say Li by Lim, Say Li

    Published 2017
    “…Neural Network (NN) model is chosen as the artificial intelligence approach used in this research. Levenberg-Marquardt algorithm is used as the training algorithm. …”
    Get full text
    Get full text
    Thesis