Search Results - (( intelligence system graph algorithm ) OR ( intelligence task scheduling algorithm ))

Refine Results
  1. 1
  2. 2

    Hybrid ant colony system algorithm for static and dynamic job scheduling in grid computing by Alobaedy, Mustafa Muwafak Theab

    Published 2015
    “…The main part of RMS is the scheduler algorithm which has the responsibility to map submitted tasks to available resources. …”
    Get full text
    Get full text
    Get full text
    Thesis
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10

    Modeling of static and dynamic components of bio-nanorobotic systems by Gavgani, Hamidreza Khataee

    Published 2012
    “…The first modeling technique applies graph algorithms to compute a new set of optimal weighted structural properties of C60 and C70 fullerenes. …”
    Get full text
    Get full text
    Thesis
  11. 11
  12. 12
  13. 13

    Optimization of Maximum Power Point Tracking (MPPT) of Photovoltaic System using Artificial Intelligence (AI) Algorithms by Raal Mandour, Raal

    Published 2013
    “…Studies on the conventional and intelligent algorithms are conducted and a comparison between their efficiencies and drawbacks is presented. …”
    Get full text
    Get full text
    Final Year Project
  14. 14

    Development of optimized maintenance scheduling model for coal-fired power plant boiler by Noor Fazreen Binti Ahmad Fuzi, Ms.

    Published 2023
    “…Computing intelligence is a soft-computing subset of artificial intelligence referring to the potential of a computer to gain knowledge from an experimental observations or specific task. …”
    text::Thesis
  15. 15

    Industry 5.0 and Education 5.0: Transforming Vocational Education through Intelligent Technology by Zhang, Hongli, Leong, Wai Yie

    Published 2024
    “…By analyzing the research gaps in personalized learning paths, emotion-driven learning, crossdisciplinary integration, and long-term learning behavior analysis, the paper proposes four improved algorithms: the adaptive learning path generation algorithm, the emotion-driven personalized learning algorithm, the cross-disciplinary knowledge graph algorithm, and the long-term learning behavior prediction algorithm. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Get full text
    Article
  16. 16

    Intelligent dashboard with speech enhancement by Abdul Rahman, Abdul Wahab, Tan, Eng Chong, Abut, Huseyin

    Published 1997
    “…Numerous asynchronous scheduling tasks necessitate the architecture to be re-configurable. …”
    Get full text
    Get full text
    Get full text
    Proceeding Paper
  17. 17
  18. 18

    Graph theory-based radial load flow analysis to solve the dynamic network reconfiguration problem by Aman, M.M., Jasmon, G.B., Bakar, Ab Halim Abu, Mokhlis, Hazlie, Naidu, K.

    Published 2016
    “…This paper has presented an intelligent graph theory-based RLF analysis to solve "dynamic" problems. …”
    Get full text
    Get full text
    Article
  19. 19

    Processing time estimation in precision machining industry using AI / Lim Say Li by Lim, Say Li

    Published 2017
    “…Neural Network (NN) model is chosen as the artificial intelligence approach used in this research. Levenberg-Marquardt algorithm is used as the training algorithm. …”
    Get full text
    Get full text
    Thesis
  20. 20