Search Results - (( integer implementation plan algorithm ) OR ( java implementation max algorithm ))

  • Showing 1 - 13 results of 13
Refine Results
  1. 1

    OPTIMIZED MIN-MIN TASK SCHEDULING ALGORITHM FOR SCIENTIFIC WORKFLOWS IN A CLOUD ENVIRONMENT by Murad S.S., Badeel R., Alsandi N.S.A., Alshaaya R.F., Ahmed R.A., Muhammed A., Derahman M.

    Published 2023
    “…To achieve this, we propose a new noble mechanism called Optimized Min-Min (OMin-Min) algorithm, inspired by the Min-Min algorithm. The objectives of this work are: i) to provide a comprehensive review of the cloud and scheduling process; ii) to classify the scheduling strategies and scientific workflows; iii) to implement our proposed algorithm with various scheduling algorithms (i.e., Min-Min, Round-Robin, Max-Min, and Modified Max-Min) for performance comparison, within different cloudlet sizes (i.e., small, medium, large, and heavy) in three scientific workflows (i.e., Montage, Epigenomics, and SIPHT); and iv) to investigate the performance of the implemented algorithms by using CloudSim. …”
    Review
  2. 2

    Batch mode heuristic approaches for efficient task scheduling in grid computing system by Maipan-Uku, Jamilu Yahaya

    Published 2016
    “…Many algorithms have been implemented to solve the grid scheduling problem. …”
    Get full text
    Get full text
    Get full text
    Thesis
  3. 3

    Optimizing tree planting areas through integer programming and improved genetic algorithm by Md Badarudin, Ismadi

    Published 2012
    “…Therefore, a hybrid algorithm through an incorporation of Integer Programming and Improved Genetic Algorithm was proposed for planting lining design. …”
    Get full text
    Get full text
    Thesis
  4. 4

    Optimization of Upstream Offshore Oilfield Production Planning under Uncertainty and Downstream Crude Oil Scheduling at Refinery Front-End by Tan , Yin Keong

    Published 2009
    “…Acontinuous time model based on transfer events is used to represent the scheduling problem and this model is a nonconvex MINLP model which presents multiple local optima. We implement a branch-and-contract algorithm that aims at reducing the size of the search region. …”
    Get full text
    Get full text
    Final Year Project
  5. 5

    Optimization of Upstream Offshore Oilfield Production Planning under Uncertainty and Downstream Crude Oil Scheduling at Refinery Front-End by Tan Yin Keong, Tan Yin

    Published 2012
    “…A continuous time model based on transfer events is used to represent the scheduling problem and this model is a nonconvex MINLP model which presents multiple local optima. We implement a branch-and-contract algorithm that aims at reducing the size of the search region. …”
    Get full text
    Get full text
    Final Year Project
  6. 6
  7. 7

    Modified ant colony optimization algorithms for deterministic and stochastic inventory routing problems / Lily Wong by Lily , Wong

    Published 2018
    “…The computational results show that the algorithms which implement this new formulation are able to produce better solutions. …”
    Get full text
    Get full text
    Get full text
    Thesis
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12

    Solving a multi-period inventory routing problem with stochastic unstationary demand rates by Muhammad Khodri Harahap, Afif Zuhri

    Published 2022
    “…The computational results show that the algorithms that implement this modified formulation can achieve a better optimization result. …”
    Get full text
    Get full text
    Get full text
    Get full text
    Thesis
  13. 13

    Identification of debris flow initiation zones using topographic model and airborne laser scanning data by Lay, Usman Salihu, Pradhan, Biswajeet

    Published 2017
    “…MARSpline multivariate data mining predictive approach was implemented using morphometric indices and topographical derived parameter as independent variables. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item