Search Results - (( frames integrated reporting algorithm ) OR ( java application customization algorithm ))

  • Showing 1 - 5 results of 5
Refine Results
  1. 1
  2. 2
  3. 3

    Development of an integrated scheduling model for handling equipment in automated port container terminals by Sadeghian, Syed Hamidreza

    Published 2014
    “…As the integrated scheduling of handling equipment is a “non-deterministic polynomialtime hard” (NP-hard) problem and also the computation time and ease of application are so important for real practices of the scheduling methods, So a meta-heuristic algorithm based on Genetic Algorithm is developed, in which, new operators create solutions considering the constraints of the problem and also a heuristic rule proposed which assigns the ALVs to the tasks. …”
    Get full text
    Get full text
    Thesis
  4. 4

    Enhancing obfuscation technique for protecting source code against software reverse engineering by Mahfoudh, Asma

    Published 2019
    “…The proposed technique can be enhanced in the future to protect games applications and mobile applications that are developed by java; it can improve the software development industry. …”
    Get full text
    Get full text
    Thesis
  5. 5

    Design & Development of a Robotic System Using LEGO Mindstorm by Abd Manap, Nurulfajar, Md Salim, Sani Irwan, Haron, Nor Zaidi

    Published 2006
    “…Since the model is built using LEGO bricks, the model is fully customized, in term of its applications, to perform any relevant tasks. …”
    Get full text
    Get full text
    Get full text
    Conference or Workshop Item